PRODUCTION BATCHING WITH MACHINE BREAKDOWNS AND SAFETY STOCKS

被引:94
作者
GROENEVELT, H [1 ]
PINTELON, L [1 ]
SEIDMANN, A [1 ]
机构
[1] KATHOLIEKE UNIV LEUVEN,DEPT IND MANAGEMENT,LOUVAIN,BELGIUM
关键词
D O I
10.1287/opre.40.5.959
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study the problem of selecting the economic lot size for an unreliable manufacturing facility with a constant failure rate and general randomly distributed repair times. Safety stocks must be used to meet the managerially prescribed service level (the fraction of lost sales) because these stochastic interventions reduce the effective production capacity. We develop bounds on the range of feasible service levels and investigate the impact of several system parameters on this range. We introduce an easily implementable production control policy (but do not establish the optimality of its structure) and prove that under this policy the safety stock dynamics can be characterized fully by a renewal process analogous to the workload process of a special single server queueing system. This analogy is exploited in deriving exact and approximate expressions for the safety stock holding costs. Several operational insights are revealed by experimenting with the models developed here. We show how the results can be incorporated in a broader management framework for evaluating resource allocation decisions aimed at reducing the failure rate of the machines. A clear tradeoff is shown to exist between the overall investment in increasing the maintenance level and the resulting savings in safety stocks and repair costs.
引用
收藏
页码:959 / 971
页数:13
相关论文
共 27 条
  • [1] [Anonymous], 1989, PRODUCTION OPERATION
  • [2] BARLOW RE, 1965, MATH THEORY RELIABIL
  • [3] OPTIMALITY OF ZERO-INVENTORY POLICIES FOR UNRELIABLE MANUFACTURING SYSTEMS
    BIELECKI, T
    KUMAR, PR
    [J]. OPERATIONS RESEARCH, 1988, 36 (04) : 532 - 541
  • [4] GALLEGO G, 1988, 770 CORN U COLL ENG
  • [5] GALLEGO G, 1988, 771 CORN U COLL ENG
  • [6] PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS
    GROENEVELT, H
    PINTELON, L
    SEIDMANN, A
    [J]. MANAGEMENT SCIENCE, 1992, 38 (01) : 104 - 123
  • [7] Harris, 1985, FUNDAMENTALS QUEUEIN
  • [8] THE STRUCTURE OF PERIODIC REVIEW POLICIES IN THE PRESENCE OF RANDOM YIELD
    HENIG, M
    GERCHAK, Y
    [J]. OPERATIONS RESEARCH, 1990, 38 (04) : 634 - 643
  • [9] LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES
    KARMARKAR, US
    [J]. MANAGEMENT SCIENCE, 1987, 33 (03) : 409 - 418
  • [10] IMPACT OF INVESTING IN QUALITY IMPROVEMENT ON THE LOT SIZE MODEL
    KELLER, G
    NOORI, H
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (06): : 595 - 601