共 22 条
[1]
SERIES CAPACITOR INSTALLATIONS IN BC HYDRO 500 KV SYSTEM
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1977, 96 (06)
:1767-1776
[2]
BERNERYD S, 1976, CIGRE1304 PAP
[3]
ANALYSIS OF RE-IGNITION OF MULTIPLE BREAK SWITCHES DEVICES APPLICATION TO SHUNT REACTOR CURRENT INTERRUPTION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1984, 103 (06)
:1377-1385
[4]
CROWLEY E, 1982, CIGRE2110 PAP
[5]
DOWELL AJ, 1976, CIGRE1302 PAP
[6]
DYNAMIC STABILITY OF PEACE RIVER TRANSMISSION SYSTEM
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1966, PA85 (06)
:586-+
[7]
Eriksson R., 1979, International Conference on Developments in Design and Performance of EHV Switching Equipment, P119
[8]
ARC INSTABILITY AND CURRENT CHOPPING IN AN AIR-BLAST INTERRUPTER
[J].
PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON,
1977, 124 (07)
:619-627
[9]
GOFF HSH, 1966, IEEE T PAS, V85, P610
[10]
HENRY JC, 1978, CIGRE1308 PAP