MANAGEMENT PROBLEMS OF REMOTE CONSTRUCTION PROJECTS AND POTENTIAL IT SOLUTIONS; THE CASE OF KINGDOM OF SAUDI ARABIA

被引:0
|
作者
Sidawi, Bhzad [1 ]
机构
[1] Univ Dammam, Coll Architecture & Planning, POB 2397, ZA-31451 Dammam, Saudi Arabia
关键词
Mobile systems; Web-based project management systems; remote manager; virtual management;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Remote projects have their unique problems that are caused mainly by the remoteness of the project itself thus the loose control over communications and management. This is due to a number of reasons such as lack of management skills, human resources and infrastructure. Little research was undertaken particularly in the gulf region regarding this issue and it has highlighted few unique communications and management problems. This paper investigates the current problems that the Saudi Electric Company (SEC), Kingdom of Saudi Arabia (KSA) experiences regarding the management of its' remote construction sites. It discusses the opinions of contractors and the SEC's supervision teams regarding the weaknesses in the present communications and management practices. The study found systematic project management problems that have profound negative impact on remote projects' performance and process. The paper suggests that some of these problems can be sorted out by the use of Advanced Computer based Management Systems (ACMS) and these would improve some project management practices. However, organizational barriers may hinder the potentiality of these systems thus changes to the organization's management system and practices should be carried out to achieve full benefits.
引用
收藏
页码:103 / 120
页数:18
相关论文
共 50 条
  • [1] Cash Flow Management of Construction Projects in Saudi Arabia
    Shash, Ali A.
    Al Qarra, Abdulaziz
    PROJECT MANAGEMENT JOURNAL, 2018, 49 (05) : 48 - 63
  • [2] Remote Litigation in the Kingdom of Saudi Arabia
    Al-Shaibani, Majed N.
    INTERNATIONAL JOURNAL OF CRIMINAL JUSTICE SCIENCES, 2022, 17 (02): : 61 - 74
  • [3] Improving clients' satisfaction in construction projects: the case of Saudi Arabia
    Alshihre, Fawaz
    Chinyio, Ezekiel
    Nzekwe-Excel, Chinny
    Daniel, Emmanuel, I
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (05) : 709 - 723
  • [4] Critical Barriers to Social Responsibility Implementation within Mega-Construction Projects: The Case of the Kingdom of Saudi Arabia
    Alotaibi, Ali
    Edum-Fotwe, Francis
    Price, Andrew D. F.
    SUSTAINABILITY, 2019, 11 (06)
  • [5] Effects of change orders on the budget of the public sector construction projects in the kingdom of Saudi Arabia
    Alkhattabi, Loai
    Alkhard, Ahmed
    Gouda, Ahmed
    RESULTS IN ENGINEERING, 2023, 20
  • [6] Change Orders and Their Domino Effect: Insights from Public Construction Projects in the Kingdom of Saudi Arabia
    Alsulami, Badr T.
    BUILDINGS, 2025, 15 (01)
  • [7] Mega-Projects in Construction: Barriers in the Implementation of Circular Economy Concepts in the Kingdom of Saudi Arabia
    Alotaibi, Saud
    Martinez-Vazquez, Pedro
    Baniotopoulos, Charalampos
    BUILDINGS, 2024, 14 (05)
  • [8] mHealth for diabetes self-management in the Kingdom of Saudi Arabia: barriers and solutions
    Alanzi, Turki
    JOURNAL OF MULTIDISCIPLINARY HEALTHCARE, 2018, 11 : 535 - 546
  • [9] Potential of geothermal energy in the Kingdom of Saudi Arabia
    Demirbas, Ayhan
    Alidrisi, Hisham
    Ahmad, Waqar
    Sheikh, Manzoor H.
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2016, 38 (15) : 2238 - 2243
  • [10] Knowledge Management in International Aerospace Collaboration Projects: The Case of Saudi Arabia
    Al-Shaigi, Homoud
    Al-Ashaab, Ahmed
    ADVANCES IN MANUFACTURING TECHNOLOGY XXXI, 2017, 6 : 497 - 502