LOWER BOUND SOLUTIONS TO MULTISTAGE PRODUCTION SCHEDULING PROBLEMS WITH STARTUP DELAYS

被引:0
作者
BIGHAM, PE [1 ]
MOGG, JM [1 ]
机构
[1] UNIV HOUSTON,DEPT BUSINESS ADM,DEPT QUANTITAT MANAGEMENT SCI,HOUSTON,TX 77004
来源
AIIE TRANSACTIONS | 1979年 / 11卷 / 04期
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:313 / 318
页数:6
相关论文
共 50 条
[31]   Production Scheduling in Multiproduct Multistage Semicontinuous Food Processes [J].
Kopanos, Georgios M. ;
Puigjaner, Luis ;
Georgiadis, Michael C. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2011, 50 (10) :6316-6324
[32]   Multiproduct multistage production scheduling (MMPS) for manufacturing systems [J].
Carvalho, MF ;
Fernandes, CAO ;
Ferreira, PAV .
PRODUCTION PLANNING & CONTROL, 1999, 10 (07) :671-681
[33]   Pareto-optimal solutions for multi-objective production scheduling problems [J].
Bagchi, TP .
EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, PROCEEDINGS, 2001, 1993 :458-471
[34]   Improved DE algorithm for multipurpose multistage batch scheduling problems [J].
Yan, Ping ;
Jiao, Ming-hai .
2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, :2424-2428
[35]   Bicriteria approximation algorithms for scheduling problems with communications delays [J].
Evripidis Bampis ;
Alexander Kononov .
Journal of Scheduling, 2005, 8 :281-294
[36]   Bicriteria approximation algorithms for scheduling problems with communications delays [J].
Bampis, E ;
Kononov, A .
JOURNAL OF SCHEDULING, 2005, 8 (04) :281-294
[37]   Sharing delay costs in stochastic scheduling problems with delays [J].
Goncalves-Dosantos, J. C. ;
Garcia-Jurado, I. ;
Costa, J. .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2020, 18 (04) :457-476
[39]   A LOWER BOUND AND AN EFFICIENT HEURISTIC FOR MULTISTAGE MULTIPRODUCT DISTRIBUTION-SYSTEMS [J].
IYOGUN, P ;
ATKINS, D .
MANAGEMENT SCIENCE, 1993, 39 (02) :204-217
[40]   Sharing delay costs in stochastic scheduling problems with delays [J].
J. C. Gonçalves-Dosantos ;
I. García-Jurado ;
J. Costa .
4OR, 2020, 18 :457-476