SCHEDULING OF PROJECTS UNDER THE CONDITION OF INFLATION

被引:5
作者
JOLAYEMI, J
OLULEYE, A
机构
[1] University of Ibadan, Ibadan
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1993年 / 21卷 / 04期
关键词
COST MODEL; PROJECT MANAGEMENT; LP; INFLATION;
D O I
10.1016/0305-0483(93)90080-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper (see alw [4]) develops a linear programming (LP) model for in efficient scheduling and management of big projects. The model has an inflation factor as one of its major features and incorporates an extensive modification of existing project scheduling models. The paper includes numerical examples to demonstrate the usefulness of the model and the consequences of excluding inflation factor during project cost-estimation, planning and scheduling in an environment of high inflation. By transforming the variables of the LP model, a new model with fewer constraints is obtained, thereby reducing the amount of effort required to find an optimal solution.
引用
收藏
页码:481 / 487
页数:7
相关论文
共 9 条
[1]  
DAVIS EW, 1974, J IND ENG, V6, P117
[2]  
DEAN BV, 1980, TIMS STUDIES MANAGEM, V15, P215
[3]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR
[4]  
JOLAYEMI JK, 1991, 1980 P C NIG I IND E, P78
[5]   CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS [J].
KELLEY, JE .
OPERATIONS RESEARCH, 1961, 9 (03) :296-320
[6]  
Moder J. J., 1983, PROJECT MANAGEMENT C
[8]  
TOMLIN JA, 1987, MATH PROGRAM STUD, V31, P175
[9]  
Walker, 1959, P E JOINT COMP C, P160, DOI DOI 10.1145/1460299.1460318