共 50 条
- [31] STABILITY OF A 2-STAGE PRODUCTION AND INVENTORY MODEL ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 20 (01): : 65 - 71
- [32] PRODUCTION BATCH SIZES IN A REPETITIVE FLEXIBLE ASSEMBLY SYSTEM. Production and inventory management Washington, D.C., 1987, 28 (03): : 34 - 38