A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem

被引:11
作者
Avikal, Shwetank [1 ]
Mishra, P. K. [2 ]
Jain, Rajeev [3 ]
Yadav, H. C. [4 ]
机构
[1] Graph Era Hill Univ, Dept Mech Engn, Dehra Dun, India
[2] Motilal Nehru Natl Inst Technol, Dept Mech Engn, Allahabad, Uttar Pradesh, India
[3] Kalaniketan Polytech Coll Jabapur, Dept Mech Engn, Jabapur, India
[4] Motilal Nehru Natl Inst Technol, Dept Mech Engn, Allahabad, Uttar Pradesh, India
来源
INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS | 2013年 / 12卷 / 03期
关键词
dHeuristic; Line Balancing; MCDM; PROMETHEE Method; Product Disassembly;
D O I
10.7232/iems.2013.12.3.254
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Disassembly of discarded products takes place in the process of remanufacturing, recycling, and disposal. The disassembly lines have been taken as available choice for automated disassembly; therefore, it has become essential that it be designed and balanced to work efficiently. The multi-objective disassembly line balancing problem seeks to find a disassembly sequence which provides a feasible disassembly sequence, minimizes the number of workstations and idle time, and balances the line for the disassembly of post consumed product by considering the environment effects. This paper proposes a multi-criteria decision making technique based heuristic for assigning the disassembly tasks to the workstations. In the proposed heuristic, the PROMETHEE method is used for prioritizing the tasks to be assigned. The tasks are assigned to the disassembly workstations according to their priority rank and precedence relations. The proposed heuristic is illustrated with an example, and the results show that substantial improvement in the performance is achieved compared with other heuristics.
引用
收藏
页码:254 / 263
页数:10
相关论文
共 39 条
[1]   Profit-oriented disassembly-line balancing [J].
Altekin, F. Tevhide ;
Kandiller, Levent ;
Ozdemirel, Nur Evin .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (10) :2675-2693
[2]   A parallel station heuristic for the mixed-model production line balancing problem [J].
Askin, RG ;
Zhou, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) :3095-3105
[3]  
Athawale V.M., 2010, P 2010 INT C IND ENG, P59
[4]   A heuristic approach for U-shaped assembly line balancing to improve labor productivity [J].
Avikal, Shwetank ;
Jain, Rajeev ;
Mishra, P. K. ;
Yadav, H. C. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) :895-901
[5]   A dynamic programming based heuristic for the assembly line balancing problem [J].
Bautista, Joaquin ;
Pereira, Jordi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) :787-794
[7]   A classification of assembly line balancing problems [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) :674-693
[8]  
Brans J.P., 1982, LAIDE DECISION NATUR, P183
[9]   A PREFERENCE RANKING ORGANIZATION METHOD - (THE PROMETHEE METHOD FOR MULTIPLE CRITERIA DECISION-MAKING) [J].
BRANS, JP ;
VINCKE, PH .
MANAGEMENT SCIENCE, 1985, 31 (06) :647-656
[10]   THE PROMCALC AND GAIA DECISION-SUPPORT SYSTEM FOR MULTICRITERIA DECISION AID [J].
BRANS, JP ;
MARESCHAL, B .
DECISION SUPPORT SYSTEMS, 1994, 12 (4-5) :297-310