The first two years of full scale operation of the two-stage Main Wastewater Treatment Plant of Vienna

被引:1
作者
Wandl, G. [1 ]
Schaar, H. [2 ]
Papp, M. [1 ]
Svardal, K. [2 ]
机构
[1] EbS Entsorgungsbetriebe Simmering Ges mbH 11, Haidequerstr 7, A-1110 Vienna, Austria
[2] Vienna Univ Technol, Inst Water Qual Resources & Waste Management, A-1040 Vienna, Austria
来源
WATER PRACTICE AND TECHNOLOGY | 2009年 / 4卷 / 01期
关键词
mass balance; nitrogen removal; plant layout; process flexibility; two-stage activated sludge plants; wastewater treatment;
D O I
10.2166/wpt.2009.005
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The Main Wastewater Treatment Plant of Vienna had to be extended to guarantee sufficient nitrogen removal. After intensive evaluation studies a two-stage activated sludge system was chosen for the plant-extension. Due to the very small specific reactor tank volume of two-stage treatment plants in comparison with low loaded single-stage plants internal cycles had to be applied to ensure sufficient nitrogen removal. Starting in the year 2000 the plant extension was finished by the beginning of 2005 and the extended plant went into operation in spring. The Austrian effluent standards had to be fulfilled by December 2005. This paper presents a description of the plant layout and gives an overview of the operating results of the first two years of full scale operation. Mass balances were used to evaluate the pathways of nitrogen removal. The results confirmed the expected flexibility of the chosen concept; nitrogen elimination did not decrease although the effluent recirculation that has been implemented to ensure sufficient nitrogen removal efficiency especially during winter had been reduced markedly due to energy reasons. The treatment efficiency that was observed at pilot plant investigations was clearly exceeded.
引用
收藏
页数:8
相关论文
共 9 条
  • [1] [Anonymous], 2000, DIMENSIONING SINGLE
  • [2] Nutrient removal process development and full scale implementation at the 4 million p.e main treatment plant of Vienna, Austria
    Kroiss, H
    Klager, F
    Winkler, S
    Wandl, G
    Svardal, K
    [J]. WATER SCIENCE AND TECHNOLOGY, 2004, 50 (07) : 19 - 26
  • [3] OPERATION OF A 2-STAGE ACTIVATED-SLUDGE PACKAGE PLANT FOR HIGH-EFFICIENCY TREATMENT
    MATSCHE, N
    MOSER, D
    [J]. WATER SCIENCE AND TECHNOLOGY, 1993, 28 (10) : 299 - 307
  • [4] Comparison of different operational modes of a two-stage activated sludge pilot plant for the extension of the Vienna STP
    Müller-Rechberger, H
    Wandl, G
    Winkler, S
    Svardal, K
    Matsché, N
    [J]. WATER SCIENCE AND TECHNOLOGY, 2001, 44 (01) : 137 - 144
  • [5] Nowak O, 1999, WATER SCI TECHNOL, V39, P113, DOI 10.1016/S0273-1223(99)00065-7
  • [6] Papp M., 2007, P IWA C LWWTP07
  • [7] Optimum aerobic volume control based on continuous in-line oxygen uptake monitoring
    Svardal, K
    Lindtner, S
    Winkler, S
    [J]. WATER SCIENCE AND TECHNOLOGY, 2003, 47 (11) : 305 - 312
  • [8] VONDEREMDE W, 1982, WATER SCI TECHNOL, V14, P493
  • [9] Two stage activated sludge plants -: influence of different operational modes on sludge bulking and nitrification
    Wandl, G
    Müller-Rechberger, H
    Matsché, N
    Svardal, K
    Winkler, S
    [J]. WATER SCIENCE AND TECHNOLOGY, 2002, 46 (1-2) : 479 - 486