Using hybrid simulated annealing algorithm in resource constrained project scheduling problem

被引:0
作者
Pan, Nai-Hsin [1 ]
Lin, Yung-Yu [2 ]
机构
[1] Natl Yunlin Univ Sci & Technol, Dept Construct Engn, 123 Univ Rd, Douliou, Yunlin, Peoples R China
[2] Natl Yunlin Univ Sci & Technol, Grad Sch Engn Sci & Technol, Douliou, Yunlin, Peoples R China
关键词
Resource constrained; Simulated annealing; Optimization;
D O I
暂无
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Mostly the way of solving resource constrained project scheduling problem (RCPSP) will rely on implementing mathematical modeling. However, it often results in the low efficiency of solution searching. Therefore, exploring a more efficient alterative to solve the RCPSP is the main objective of the paper. Simulated Annealing (SA) has been proven an excellent heuristic technique of neighborhood search for solving combinatorial optimization problems in various fields. However, simple SA algorithm cannot guarantee to obtain a better solution quality on solving the combinatorial optimization problem compared with the other heuristic techniques. To enhance the quality and efficiency of solution searching, the paper presents a hybrid SA based algorithm to solve the RCPSP and a program with a good user interface which can link with a well known project management software- Microsoft Project 2000. The outcome of using the algorithm to solve the RCPSP has been shown better than other heuristic techniques after cases experiment.
引用
收藏
页码:555 / 582
页数:28
相关论文
共 21 条
  • [1] Ahmedb S., 2001, J CONSTR ENG MANAGE, V127, P28
  • [2] Ahuja N. H., 1994, PROJECT MANAGEMENT T, P127
  • [3] Boctor F. F., 1990, EUR J OPER RES, V9, P9
  • [4] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [5] Construction resource scheduling with genetic algorithms
    Chan, WT
    Chua, DKH
    Kannan, G
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02): : 125 - 132
  • [6] COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DAVIS, EW
    PATTERSON, JH
    [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08): : 944 - 955
  • [7] Gen M., 1997, GENETIC ALGORITHMS E
  • [8] Optimization of resource allocation and leveling using genetic algorithms
    Hegazy, T
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03): : 167 - 175
  • [9] SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING
    JEFFCOAT, DE
    BULFIN, RL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) : 43 - 51
  • [10] RESOURCE-MANAGEMENT IN CONSTRUCTION
    KARAA, FA
    NASR, AY
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1986, 112 (03): : 346 - 357