共 50 条
[42]
THE INCORE MEASURING SYSTEM OF THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER
[J].
KERNENERGIE,
1980, 23 (06)
:226-229
[43]
CORROSION OF STRUCTURAL MATERIALS DURING START-UP OF NUCLEAR POWER STATIONS.
[J].
Protection of Metals (English translation of Zaschita Metallov),
1981, 17 (01)
:88-90
[44]
Selection and Experimental Research of the Passive Start-Up Neutron Detector in Nuclear Power Plant
[J].
Hedongli Gongcheng/Nuclear Power Engineering,
2022, 43 (03)
:139-143
[45]
Optimal strategy for units start-up during power system restoration
[J].
Diangong Jishu Xuebao/Transactions of China Electrotechnical Society,
2009, 24 (03)
:164-170
[46]
Impact of start-up mode on flexible power plant operation and system cost
[J].
2016 13TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM),
2016,
[47]
THE LEGACY OF TMI-2 FOR THE NUCLEAR-POWER PLANT-OPERATIONS SYSTEM
[J].
COMBUSTION,
1980, 52 (05)
:10-18
[48]
INCLUDING PLANT OPERATING PARAMETERS IN THE REMOTE MONITORING SYSTEMS OF NUCLEAR-POWER PLANTS
[J].
ATOMWIRTSCHAFT-ATOMTECHNIK,
1983, 28 (05)
:264-268
[49]
OPERATIVE MONITORING-SYSTEM FOR ENERGY-LIBERATION FIELDS OF REACTORS IN BELOYARSK NUCLEAR-POWER STATION
[J].
SOVIET ATOMIC ENERGY,
1976, 40 (02)
:174-177
[50]
THE SYSTEM FOR MONITORING NUCLEAR MATERIAL AT THE KALKAR NUCLEAR-POWER PLANT SNR-300
[J].
ATOM & STROM,
1985, 31 (03)
:79-81