READINESS FOR INDUSTRIALIZED BUILDING SYSTEM IMPLEMENTATION AMONG MALAYSIAN ARCHITECTURAL FIRMS' MEMBERS

被引:0
作者
Hanafi, Mohd Hanizun [1 ]
Abasa, Arniza
Ibrahim, Fazdliel Aswad [2 ]
Abdullah, Shardy [3 ]
机构
[1] Univ Sains Malaysia, Sch Housing Bldg & Planning, George Town 11800, Malaysia
[2] UniMAP, Fac Engn Technol, Campus UniCITI Alam,02100 Sg, Padang Besar 02100, Perlis, Malaysia
[3] Univ Malaysia Kelantan, Fac Heritage & Creat Technol, Karung Berkunci 01, Bachok 16300, Kelantan, Malaysia
来源
JURNAL TEKNOLOGI | 2016年 / 78卷 / 07期
关键词
Organizational readiness; architectural firms; implementation; industrialized building system; Malaysia;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Malaysian construction industry has lags behind other industries in terms of performance that had drawn the attention to implement innovative construction method like Industrial Building System (IBS). However, the implementation of IBS in Malaysia remains low although the Government had commenced various efforts. The architects have been perceived as the prime mover for construction innovations by integrating their roles as designer, manager, and professional advisor with their strength in design. Therefore, this paper is designed to assess readiness for IBS implementation among organizational members of architectural firms by examining the influence of demographic backgrounds. The study distributes questionnaires to randomly selected respondents who represent firms that are located in highly developed states in Malaysia. Various analysis techniques have been used namely Cronbach's Alpha coefficients, frequency, mean, standard deviation, one-way ANOVA, and independent samples t-test towards achieving the research objective. The findings disclose that working experience in tender and construction stage (more than 18 years) indicate high likelihood of readiness to implement IBS. This research also reveals that demographic variables (job designation, working experience in design stage, and working experience in tender and construction stage) has significant impacts on the decision maker category, whereas decision maker is the most influential aspect for organizational readiness to implement IBS.
引用
收藏
页码:195 / 203
页数:9
相关论文
共 37 条
[11]  
Davis K. A., 2008, CIB W78 2008 INT C I, P112
[12]  
Department of Statistics Malaysia, 2012, EC CENS 2011 CONSTR
[13]  
EVANS G, 1995, PUBLIC UNDERST SCI, V0004
[14]   Postmodernism; Or, the cultural logic of post-Fordism? [J].
Gartman, D .
SOCIOLOGICAL QUARTERLY, 1998, 39 (01) :119-137
[15]  
Hamid Z., 2009, BUHU 9 INT POSTGR RE, P45
[16]   The use of expert judges in scale development - Implications for improving face validity of measures of unobservable constructs [J].
Hardesty, DM ;
Bearden, WO .
JOURNAL OF BUSINESS RESEARCH, 2004, 57 (02) :98-107
[17]   ON THE TEST-RETEST RELIABILITY OF PERCEIVED USEFULNESS AND PERCEIVED EASE OF USE SCALES [J].
HENDRICKSON, AR ;
MASSEY, PD ;
CRONAN, TP .
MIS QUARTERLY, 1993, 17 (02) :227-230
[18]  
Holt DT, 2007, RES ORGAN CHAN DEV, V16, P289, DOI 10.1016/S0897-3016(06)16009-7
[19]  
Ibrahim A. R., 2010, BENCHMARKING, V17, P294, DOI DOI 10.1108/14635771011036357
[20]   Is there a role for architects in mainstream private sector house building? [J].
Jenkins, Paul ;
McLachlan, Fiona .
JOURNAL OF ARCHITECTURE, 2010, 15 (02) :153-180