JOB-SHOP SCHEDULING TO MINIMIZE TOTAL WAITING TIME

被引:5
作者
Chu, Chengbin [1 ]
Portmann, Marie-Claude [2 ]
机构
[1] INRIA Lorraine, Projet SAGEP, F-57070 Metz, France
[2] Ecole Mines, F-54042 Nancy, France
关键词
Job-shop scheduling; Total waiting time minimization; Heuristics;
D O I
10.1002/asm.3150090210
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the job-shop scheduling problem to minimize total waiting time. This also is equivalent to minimizing the work in process. Although, this problem is of relevance to manufacturing systems (Job-shops), most of the work in the literature concerns the minimization of makespan for which the algorithms proposed are implicit enumeration procedures. For the minimization of total waiting time, to our knowledge, there are only empirical priority rules, all of which construct non-delay schedules (i.e. there is no inserted idle time on the machines). In this work, we use theoretical results obtained for a single machine scheduling problem to construct an efficient heuristic for the problem at hand. This algorithm provides active schedules that are not always non-delay schedules. The convergence and the complexity of the algorithm are discussed. The performance is also evaluated with respect to a classical priority rule.
引用
收藏
页码:177 / 185
页数:9
相关论文
共 16 条
[1]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[2]  
ARUMUGAM V, 1985, SIMULATION, V45, P179, DOI 10.1177/003754978504500404
[4]   SCHEDULING WITH RELEASE DATES ON A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME [J].
BELOUADAH, H ;
POSNER, ME ;
POTTS, CN .
DISCRETE APPLIED MATHEMATICS, 1992, 36 (03) :213-231
[5]   SCHEDULING OF A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME SUBJECT TO RELEASE DATES [J].
BIANCO, L ;
RICCIARDELLI, S .
NAVAL RESEARCH LOGISTICS, 1982, 29 (01) :151-167
[6]   AN ALGORITHM FOR SOLVING THE JOB-SHOP PROBLEM [J].
CARLIER, J ;
PINSON, E .
MANAGEMENT SCIENCE, 1989, 35 (02) :164-176
[7]  
CARLIER J, 1978, RAIRO-RECH OPER, V12, P333
[8]  
CHU CB, 1992, NAV RES LOG, V39, P859, DOI 10.1002/1520-6750(199210)39:6<859::AID-NAV3220390610>3.0.CO
[9]  
2-W
[10]   EFFICIENT HEURISTICS TO MINIMIZE TOTAL FLOW TIME WITH RELEASE DATES [J].
CHU, CB .
OPERATIONS RESEARCH LETTERS, 1992, 12 (05) :321-330