共 11 条
- [1] Zangwill, A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach, Management Science, 15, pp. 506-527, (1969)
- [2] Love, A Facilities in Series Inventory Model with Nested Schedules, Management Science, 18, pp. 327-338, (1972)
- [3] Lambrecht, Vander Eecken, Vanderveken, Review of optimal and heuristic methods for a class of facilities in series dynamic lot size problems, TIMS Studies, (1981)
- [4] Graves, Multi-stage lot sizing: an iterative procedure, TIMS Studies, (1981)
- [5] Blackburn, Millen, Improved heuristics for multi-stage requirements planning systems, Manage. Sci., 28, pp. 44-56, (1982)
- [6] Chand, Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules, Management Science, 28, pp. 237-249, (1983)
- [7] Afentakis, Cavish, Karmarkar, Computationally efficient optimal solutions to the lot sizing problem in multistage assembly systems, Manage. Sci., 30, pp. 222-239, (1984)
- [8] Richter, The two-critical dynamic lot size problem, Systems Analysis, Modelling and Simulation, 3, 1, pp. 99-105, (1986)
- [9] Richter, Stability of the constant cost dynamic lot sizing model, Eur. J. Oper. Res., 31, pp. 61-65, (1987)
- [10] Richter, Voros, A parametric analysis of the dynamic lot size problem, J. Inf. Process. Cybern., 25, 3, pp. 67-73, (1989)