SETTING CONSTRUCTION CONTRACT DURATION - PUBLIC PROJECTS IN SAUDI-ARABIA - DESCRIPTION OF THE PRACTICE USED BY THE PUBLIC AGENCIES IN SETTING CONSTRUCTION CONTRACT DURATION, CCD, IN SAUDI-ARABIA

被引:0
作者
ALMOHAWIS, SA [1 ]
ALSULTAN, AS [1 ]
机构
[1] GEN DIRECTORATE WATER & SEWAGE QASIM,BURAYDAH,SAUDI ARABIA
关键词
CONSTRUCTION DURATION; PUBLIC PROJECTS; SAUDI-ARABIA;
D O I
10.1080/09613219408727383
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A detailed survey of the public agencies revealed three patterns for setting CCD and the growing need for developing formal and systematic procedures.
引用
收藏
页码:211 / 213
页数:3
相关论文
共 11 条
[1]  
Agresti A., 1984, ANAL ORDINAL CATEGOR
[2]  
Antill JM, 1982, CRITICAL PATH METHOD
[3]  
BROWMILOW F, 1980, BUILDING EC, V19, P79
[4]  
CLAUGH R, 1981, CONSTRUCTION CONTRAC
[5]  
GATES M, 1977, TRANSPORT ENG-J ASCE, V103, P773
[6]  
HANCHER D, 1981, J CONSTRUCTION DIVIS, V107, P167
[7]  
HEINECK D, 1987, 4TH INT S BUILD EC, P73
[8]  
Kaka A., 1991, CONSTR MANAG ECON, V9, P383
[9]  
SOETERITE F, 1976, 20 BUILD RES ASS NZ
[10]  
1981, 79 NAT RES COUNC TRA