Quantitative analysis of the impact of craft worker availability on construction project safety performance

被引:32
|
作者
Karimi, Hossein [1 ]
Taylor, Timothy R. B. [1 ]
Goodrum, Paul M. [2 ]
Srinivasan, Cidambi [3 ]
机构
[1] Univ Kentucky, Dept Civil Engn, Lexington, KY 40506 USA
[2] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
[3] Univ Kentucky, Dept Stat, Lexington, KY USA
来源
CONSTRUCTION INNOVATION-ENGLAND | 2016年 / 16卷 / 03期
关键词
Safety; Risk assessment; Construction incidents; Craft worker shortage; Poisson regression analysis; Statistical model;
D O I
10.1108/CI-10-2015-0050
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose - This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach - A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings - The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications - The projects used to construct the database are heavily weighted towards industrial construction. Practical implications - There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value - The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.
引用
收藏
页码:307 / 322
页数:16
相关论文
共 22 条
  • [1] Impact of Skilled Labor Availability on Construction Project Cost Performance
    Karimi, Hossein
    Taylor, Timothy R. B.
    Dadi, Gabriel B.
    Goodrum, Paul M.
    Srinivasan, Cidambi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (07)
  • [2] Impact of Green Building Design and Construction on Worker Safety and Health
    Rajendran, Sathyanarayanan
    Gambatese, John A.
    Behm, Michael G.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) : 1058 - 1066
  • [3] Investigating the impact of emerging technologies on construction safety performance
    Dobrucali, Esra
    Demirkesen, Sevilay
    Sadikoglu, Emel
    Zhang, Chengyi
    Damci, Atilla
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (03) : 1322 - 1347
  • [4] Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance
    Hasan, Abid
    Jha, Kumar Neeraj
    INTERNATIONAL JOURNAL OF INJURY CONTROL AND SAFETY PROMOTION, 2013, 20 (01) : 3 - 12
  • [5] Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance
    Molenaar, Keith R.
    Park, Jeong-Il
    Washington, Simon
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (06): : 488 - 496
  • [6] Utilizing construction safety leading and lagging indicators to measure project safety performance: A case study
    Versteeg, Katelyn
    Bigelow, Philip
    Dale, Ann Marie
    Chaurasia, Ashok
    SAFETY SCIENCE, 2019, 120 : 411 - 421
  • [7] Analysis of sustainable competitive advantages based on project safety in construction industry
    Hu, XL
    Wen, Q
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 389 - 391
  • [8] Occupational safety risk analysis in construction sites based on fuzzy analytic hierarchy process: A case study in a large construction project
    Soltanzadeh, Ahmad
    Mahdinia, Mohsen
    Jafarinia, Ehsan
    Golmohammadpour, Hamedeh
    Sadeghi-Yarandi, Mohsen
    WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2023, 76 (02): : 771 - 782
  • [9] Methodological Analysis of KPIs to Evaluate Contractor Performance of the Construction Project
    Siddika, Ayesha
    Bhuiyan, Mohammad Masfiqul Alam
    PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 4, CSCE 2022, 2024, 367 : 639 - 652
  • [10] Synthesising performance in the construction industry An analysis of performance indicators to promote project improvement
    Mellado, Felipe
    Lou, Eric C. W.
    Becerra, Christian L. Correa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (02) : 579 - 608