Revitalising environmental, health and safety management in public sector construction projects - a case study

被引:1
|
作者
Peckitt, Stephen [1 ]
Coppin, Stephen [2 ]
机构
[1] Lend Lease, London, England
[2] Lend Lease, Dept Work & Pens, London, England
关键词
Enhanced planning supervisor role; gateways; government as client; integrated project teams; partnering;
D O I
10.1080/14774003.2005.11667662
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
In the UK, increasing scrutiny is being paid to how government departments procure construction works and, in turn, influence their health and safety performance. 1 This scrutiny is warranted, as government departments, agencies and non-departmental public bodies procure 40 per cent of construction works (by value) in the UK. 2 Government departments are a key influence on the performance of the construction industry, and calls have been made in recent years for them to improve their procurement procedures. 3 In the past, the attention paid by client departments to the environmental, health and safety management of public sector construction projects was limited by factors such as Crown immunity, a focus on time and cost, traditional procurement practices and political pressure to deliver projects on time. However, as this paper indicates, government departments can have a significant positive impact on environmental, health and safety performance when acting as clients for construction works. To demonstrate this, the paper describes how excellent performance was achieved on the Department for Work and Pensions Jobcentre Plus construction rollout programme by promoting partnering and integrated teams, employing a gateway management process, enhancing the planning supervisor role, setting contractual standards and systems, and improving consultation and training.
引用
收藏
页码:63 / 76
页数:14
相关论文
共 50 条
  • [21] A Risk Management Approach for Prediction of Contingency Sum for Public-Sector Construction Projects
    Lam, Terence
    Siwingw, Njavwa
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 367 - 378
  • [22] Conceptualizing Safety Management in Construction Projects
    Sunindijo, Riza Yosia
    Zou, Patrick X. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (09) : 1144 - 1153
  • [23] Stakeholder Management in Public Sector Infrastructure Projects
    Waris M.
    Khan A.
    Abideen A.Z.
    Sorooshian S.
    Ullah M.
    Journal of Engineering, Project, and Production Management, 2022, 12 (03) : 188 - 201
  • [24] Learning on rework management of construction projects: a case study
    Zhang, Shang
    Duan, Hongxia
    Zhao, Xianbo
    Xia, Bo
    Feng, Yingbin
    Galvin, Shane
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (03) : 246 - 260
  • [25] Balancing Environmental and Economic Objectives for In-Stream Construction Projects: A Case Study on Sediment Management
    Courtice, Gregory
    Bauer, Bernard
    ASCE Open: Multidisciplinary Journal of Civil Engineering, 2024, 2 (01):
  • [26] Challenges for Implementing Environmental Management Plans in Construction Projects: The Case of Malaysia
    Asnor, Asri Syahmi
    Al-Mohammad, Mohammad S.
    Ahmad, Saffuan Wan
    Almutairi, Saud
    Rahman, Rahimi A.
    SUSTAINABILITY, 2022, 14 (10)
  • [27] Environmental Capabilities of Suppliers for Green Supply Chain Management in Construction Projects: A Case Study in Korea
    Kim, Moon Gyu
    Woo, Chungwon
    Rho, Jae Jeung
    Chung, Yanghon
    SUSTAINABILITY, 2016, 8 (01):
  • [28] Interlocked projects in safety competency and safety effectiveness indicators in the construction sector
    Biggs, Herbert C.
    Biggs, Sarah E.
    SAFETY SCIENCE, 2013, 52 : 37 - 42
  • [29] Health behaviour and safety in the construction sector
    Melia, Jose L.
    Becerril, Marta
    PSICOTHEMA, 2009, 21 (03) : 427 - 432
  • [30] Quality, environmental, and health and safety management systems for construction engineering
    Koehn, E
    Datta, NK
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2003, 129 (05) : 562 - 569