Understanding the critical success factors for delivery of megaprojects in Colombia

被引:14
作者
Cepeda, D. M. [1 ]
Sohail, M. [2 ]
Ogunlowo, O. O. [3 ]
机构
[1] CB&I, Baton Rouge, LA USA
[2] Loughborough Univ Technol, Sch Architecture Bldg & Civil Engn, Sustainable Infrastruct, Loughborough, Leics, England
[3] Strateg Outsourcing Ltd, Lagos, Nigeria
关键词
infrastructure planning; planning & scheduling; project management;
D O I
10.1680/jmapl.17.00005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
By their very nature, megaprojects have significant short-and longer-term impacts on the socio-economic, technical, environmental and political landscapes of the host country, but many are delivered with time and cost overruns and sometimes with quality discrepancies. This paper examines the critical success factors for megaprojects in Colombia from the project definition stage to successful handover - from the perspective of professionals involved in the delivery of megaprojects in that country. It applies a mixed approach of quantitative and qualitative data collection and analysis to rank 34 factors identified in literature sources as being critical to the success of megaprojects. Analysis shows that inadequate information at the tender stage, design changes during the construction phase and limited availability and supply of materials have had a major negative influence on the delivery of megaprojects in Colombia. In contrast, adverse weather conditions and lack of prior experience with similar projects have had the least impact. This paper recommends approaches to mitigate the risks associated with the factors investigated.
引用
收藏
页码:45 / 57
页数:13
相关论文
共 50 条
[1]   Determining Critical Success Factors of Project Management Practice: A conceptual framework [J].
Alias, Zarina ;
Zawawi, E. M. A. ;
Yusof, Khalid ;
Aris, N. M. .
AMER INTERNATIONAL CONFERENCE ON QUALITY OF LIFE, AICQOL2014, 2014, 153 :61-69
[2]  
Altshuler Alan, 2003, MEGA PROJECTS CHANGI
[3]  
Anderson S., 2006, 574 NCHRP
[4]  
Anon, 2016, THE WORLDFOLIO 0309
[5]   Ranking of delay factors in construction projects after Egyptian revolution [J].
Aziz, Remon Fayek .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (03) :387-406
[6]  
Baccarini D, 2003, J CONSTRUCTION RES, V5, P211
[7]  
BNamericas, 2016, MEG PROJ LAT AM
[8]  
Bruzelius N., 2002, TRANSPORT POLICY, V9, P143, DOI DOI 10.1016/S0967-070X(02)00014-8
[9]  
Callegaro M., 2015, WEB SURVEY METHODOLO
[10]  
Capka JR, 2006, FINANCING MEGA PROJE