共 50 条
- [31] NEW COLD FORM ROLLING TECHNIQUE MACHINERY AND PRODUCTION ENGINEERING, 1972, 121 (3120): : 303 - &
- [32] FLEXIBLE WORKING TIME WITH TIME DETECTION IN A METER ASSEMBLY WITH PIECE-WAGE WORK, WAGE WORK AND ASSEMBLY-LINE WORK F&M-FEINWERKTECHNIK & MESSTECHNIK, 1982, 90 (04): : 186 - 188
- [33] A position correction equipment of work-piece in assembly line INTERNATIONAL CONFERENCE ON IMAGE PROCESSING AND PATTERN RECOGNITION IN INDUSTRIAL ENGINEERING, 2010, 7820
- [34] EFFECTS OF PRODUCT STRUCTURE ON PLANNING OF WORK ON AN EQUIPMENT ASSEMBLY LINE WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1978, 68 (03): : 133 - 136
- [35] Productivity and age: Evidence from work teams at the assembly line JOURNAL OF THE ECONOMICS OF AGEING, 2016, 7 : 30 - 42
- [36] INFLUENCE OF WORK PACE ON TRAPEZIUS MUSCLE-ACTIVITY IN ASSEMBLY-LINE WORK ERGONOMICS INTERNATIONAL 88, 1988, : 418 - 420
- [37] BRANCH + BOUND TECHNIQUE FOR MULTI-MODEL ASSEMBLY LINE INDIAN JOURNAL OF TECHNOLOGY, 1974, 12 (12): : 531 - 535
- [38] PRACTICAL PLANS OPERATING IN NEW FORMS OF WORK ORGANIZATION TRAVAIL HUMAIN, 1977, 40 (02): : 360 - 361
- [39] The New Appraisal Form for Local Health Work AMERICAN JOURNAL OF PUBLIC HEALTH AND THE NATIONS HEALTH, 1939, 29 (05): : 490 - 500