共 50 条
- [2] FEATURES OF OPERATION OF THE ONCE-THROUGH BOILER IN THE 800 MW STEAM TURBINE-GAS TURBINE PLANT OF WASTE-HEAT RECOVERY TYPE. Thermal Engineering (English translation of Teploenergetika), 1985, 32 (09): : 499 - 502
- [4] CHOICE OF STEAM CONDITIONS FOR COMBINED-CYCLE STEAM TURBINE-GAS TURBINE PLANTS WITH A WASTE-HEAT BOILER. Thermal Engineering (English translation of Teploenergetika), 1986, 33 (03): : 119 - 123
- [10] BEHAVIOR OF A GUD-(GAS-AND-STEAM TURBINE) WASTE-HEAT BOILER AS SUPERHEATED STEAM ACCUMULATOR FOR PEAK LOADS BRENNSTOFF-WARME-KRAFT, 1993, 45 (7-8): : 337 - 340