共 26 条
[3]
El-Gaafary A.A.M., 2015, UNIVERS J COMM UNNET, V3, P1, DOI [DOI 10.13189/ujcn.2015.030101, DOI 10.13189/UJCN.2015.030101]
[4]
Fisher H., 1963, IND SCHEDULING, P225
[5]
Hasan S., 2009, MEMET COMPUT, V1, P69, DOI DOI 10.1007/s12293-008-0004-5
[6]
Jorapur V. S., 2016, J SOFTWARE ENG APPL, V9, P208, DOI DOI 10.4236/jsea.2016.95017
[8]
Lawrence S., 1984, RESOURCE CONSTRAINED
[9]
An effective PSO-based hybrid algorithm for multiobjective permutation flow shop scheduling
[J].
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS,
2008, 38 (04)
:818-831