共 50 条
[23]
FEATURES AND ALGORITHMS FOR TOOLING COST EVALUATION FOR STAMPING
[J].
TOWARDS WORLD CLASS MANUFACTURING 1993,
1994, 17
:37-64
[26]
NEW OFFSHORE MAINTENANCE METHOD REDUCES COST AND DOWNTIME
[J].
PETROLEUM ENGINEER INTERNATIONAL,
1983, 55 (10)
:60-&
[27]
NEW TECHNOLOGY REDUCES DEEPWATER CONSTRUCTION COST.
[J].
Pipe Line Industry,
1979, 51 (01)
:39-42
[29]
New switching technology reduces size and cost of ATE
[J].
EE-EVALUATION ENGINEERING,
1998, 37 (10)
:68-71