PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH

被引:248
作者
CHRISTOFIDES, N [1 ]
ALVAREZVALDES, R [1 ]
TAMARIT, JM [1 ]
机构
[1] UNIV VALENCIA,VALENCIA,SPAIN
关键词
D O I
10.1016/0377-2217(87)90240-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:262 / 273
页数:12
相关论文
共 15 条
[2]  
BALAS E, 1970, APPLICATIONS MATH PR
[3]   IMPROVED FEASIBILITY TEST FOR GORENSTEINS ALGORITHM [J].
BENNINGT.GE ;
MCGINNIS, LF .
OPERATIONS RESEARCH, 1974, 22 (05) :1117-1119
[4]  
DAVIS EW, 1971, MANAGE SCI B-APPL, V17, pB803
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]  
ELMAGHRABY SE, S THEORY SCHEDULING, P294
[7]   OPTIMAL SOLUTION OF SCHEDULING PROBLEMS USING LAGRANGE MULTIPLIERS .1. [J].
FISHER, ML .
OPERATIONS RESEARCH, 1973, 21 (05) :1114-1127
[8]  
GORENSTEIN S, 1972, OPER RES, V20, P835, DOI 10.1287/opre.20.4.835
[9]  
GUTJHAR AL, 1964, MANAGEMENT SCI
[10]  
Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223