A simulated annealing hyperheuristic for construction resource levelling

被引:38
作者
Anagnostopoulos, Konstantinos P. [1 ]
Koulinas, Georgios K. [1 ]
机构
[1] Democritus Univ Thrace, Dept Prod & Management Engn, Xanthi, Greece
关键词
Hyperheuristic; metaheuristics; priorities; resource levelling; simulated annealing;
D O I
10.1080/01446190903369907
中图分类号
F [经济];
学科分类号
02 ;
摘要
Resource levelling techniques aim to minimize the fluctuation from one time period to another in resource usage. Except for small-sized problems, though, computational optimization procedures are inefficient when solving construction resource levelling problems. Consequently, heuristic and metaheuristic approaches are used to get an acceptable, but not necessarily optimal, solution. A simulated annealing hyperheuristic to generate better-levelled resource profiles is proposed. Unlike traditional heuristic algorithms, a hyperheuristic operates in the 'low level' heuristics domain rather than in the solutions domain. A low level heuristic, on the other hand, works in the current solution neighbourhood. The algorithm has been programmed within a commercial project management software system to improve its performance. The low level heuristics operate on the priority levels that the software uses for resource levelling. An illustrative example and the computational analysis demonstrate the potential of the procedure in solving complex scheduling problems.
引用
收藏
页码:163 / 175
页数:13
相关论文
共 26 条
[1]  
Aarts EHL, 1997, LOCAL SEARCH COMBINA, P91, DOI [10.1038/s41598-021-83315-9, DOI 10.1038/S41598-021-83315-9]
[2]  
Ahuja H.N., 1976, CONSTRUCTION PERFORM
[3]   OPTIMAL RESOURCE LEVELING USING NON-SERIAL DYNAMIC-PROGRAMMING [J].
BANDELLONI, M ;
TUCCI, M ;
RINALDI, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (02) :162-177
[4]  
Burgess A.R., 1962, IND ENG, V13, P76
[5]  
Burke E, 2003, HDB METAHEURISTICS I, V57, DOI DOI 10.1007/0-306-48056-5_16
[6]   A tabu-search hyperheuristic for timetabling and rostering [J].
Burke, EK ;
Kendall, G ;
Soubeiga, E .
JOURNAL OF HEURISTICS, 2003, 9 (06) :451-470
[7]   Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[8]  
Cowling P, 2002, IEEE C EVOL COMPUTAT, P1185, DOI 10.1109/CEC.2002.1004411
[9]  
Demeulemeester E., 2002, PROJECT SCHEDULING R
[10]   A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation [J].
Dowsland, Kathryn A. ;
Soubeiga, Eric ;
Burke, Edmund .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 179 (03) :759-774