COORDINATING AGGREGATE AND DETAILED SCHEDULING DECISIONS IN ONE-MACHINE JOB SHOP .1. THEORY

被引:37
作者
GELDERS, L
KLEINDORFER, PR
机构
[1] CATHOLIC UNIV LOUVAIN, LOUVAIN, BELGIUM
[2] INT INST MANAGEMENT, BERLIN, WEST GERMANY
关键词
D O I
10.1287/opre.22.1.46
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:46 / 60
页数:15
相关论文
共 18 条
[1]   SCHEDULING WITH EARLIEST START AND DUE DATE CONSTRAINT [J].
BRATLEY, P ;
ROBILLAR.P ;
FLORIAN, M .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1971, 18 (04) :511-&
[2]  
Buffa E. S., 1972, PRODUCTION INVENTORY
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]  
Dantzig G. B., 1966, LINEAR PROGRAMMING E
[5]  
ELMAGHRABY SE, 1968, J IND ENGINEERING, V19, P105
[6]   ONE-MACHINE SEQUENCING TO MINIMIZE CERTAIN FUNCTIONS OF JOB TARDINESS [J].
EMMONS, H .
OPERATIONS RESEARCH, 1969, 17 (04) :701-&
[7]  
GELDERS L, 1972, UNPUBLISHED WORKING
[8]  
GREEN RS, 1971, THESIS MIT
[9]   A DYNAMIC PROGRAMMING APPROACH TO SEQUENCING PROBLEMS [J].
HELD, M ;
KARP, RM .
JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1962, 10 (01) :196-210
[10]   ON SCHEDULING PROBLEMS WITH DEFERRAL COSTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE, 1964, 11 (02) :280-288