OPTIMAL SEQUENCING OF DEVELOPMENT FOR HYDROPOWER STATIONS IN CASCADE - CLOSURE

被引:0
|
作者
WAN, YH
HUANG, SY
MARINO, MA
机构
[1] OF S CHINA POWER NETWORK,GUANGZHOU,PEOPLES R CHINA
[2] UNIV CALIF DAVIS,DEPT LAND AIR & WAATER RESOUR,DAVIS,CA 95616
来源
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE | 1991年 / 117卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9496(1991)117:4(503.2)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
[No abstract available]
引用
收藏
页码:503 / 504
页数:2
相关论文
共 50 条
  • [21] Application of chaos optimization algorithm of mutating scale on reservoir optimal operation of cascade hydropower stations
    School of Hydropower Engineering, Hohai University, Nanjing 210098, China
    不详
    Shuili Fadian Xuebao, 2008, 6 (8-12):
  • [22] Lion swarm optimization algorithm for comparative study with application to optimal dispatch of cascade hydropower stations
    Liu, Junfeng
    Li, Dingfang
    Wu, Yun
    Liu, Dedi
    APPLIED SOFT COMPUTING, 2020, 87 (87)
  • [23] Optimal operation rules of Three-gorge and Gezhouba cascade hydropower stations in flood season
    Mu, Jie
    Ma, Chao
    Zhao, Jiaqing
    Lian, Jijian
    ENERGY CONVERSION AND MANAGEMENT, 2015, 96 : 159 - 174
  • [24] Joint optimal dispatch of Longjiang and Ruilijiang cascade hydropower stations based on improved NSGA-Ⅱ
    Li, Lingjie
    Wang, Yintang
    Ma, Jingmei
    Zhu, Rongjin
    Hu, Qingfang
    Liu, Yong
    Water Resources Protection, 2022, 38 (02): : 83 - 90
  • [25] Cascade hydropower stations optimal dispatch considering flexible margin in renewable energy power system
    Huang, Mengdi
    Chang, Jianxia
    Guo, Aijun
    Zhao, Mingzhe
    Ye, Xiangmin
    Lei, Kaixuan
    Peng, Zhiwen
    Wang, Yimin
    ENERGY, 2023, 285
  • [26] Practice of Centralized Control over Cascade Hydropower Stations
    Jin Zehua General Manager
    Electricity, 2010, 21 (01) : 44 - 47
  • [27] Optimal Operation of Cascade Hydropower Plants
    Guo, Shenglian
    Li, Xiang
    Liu, Pan
    Guo, Fuqiang
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 52 - 55
  • [28] Medium Term Subsection Robust Optimal Scheduling Method of Cascade Hydropower Stations Considering Timeshare Contract
    Yang R.
    Li G.
    Lu J.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2023, 43 (04): : 1481 - 1491
  • [29] Discussion on the monotonicity principle of the two-stage problem in joint optimal operation of cascade hydropower stations
    Wang, Chao
    Jiang, Zhiqiang
    Xu, Yichao
    Wang, Suiling
    Wang, Pengfei
    JOURNAL OF HYDROLOGY, 2023, 623
  • [30] Analysis on Electricity Pricing Mechanism for Cascade Hydropower Stations in China
    Chen, Yang
    Zhao, Yong
    Zhang, Jingrui
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2200 - 2203