Investigating the overhead costs in construction projects in Palestine

被引:9
|
作者
Enshassi, Adnan [1 ]
Aziz, Abdul [2 ]
El Karriri, Ala'a [3 ]
机构
[1] Islamic Univ Gaza, Dept Civil Engn, Gaza, Palestine, Israel
[2] Univ Sains Malaysia, Sch Housting, George Town, Malaysia
[3] UNRWA, Engn & Construct Serv Dept, Gaza, Israel
关键词
Estimation; Overhead costs; Profit; Palestine; Construction industry;
D O I
10.1108/13664380810882066
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - This paper aims to investigate the overhead costs of construction contractors at the Gaza Strip, Palestine, specifically the level of contractors' awareness of the concept of overhead cost, their perception of main components of overhead cost, percentage of overhead to total project cost, method used to manage and control overhead cost, and reasons for increasing overhead cost. Design/methodology/approach - In the research 40 contractors classified under the Palestinian Contractors Union (PCU) and United Nation Relief Works Agency (UNRWA) list were surveyed. Findings - The findings indicate that the majority of contractors are aware of overhead costs in construction projects. The staff wages are the highest overhead costs component. The currency exchange rates, inflation, increase in financial costs among others lead to increase in overhead costs. The findings illustrate that the overhead costs are on average 11.1 percent of the total project cost. Controlling and managing overhead costs are considered the main tools to improve the companies' financial situation. Practical implications - The trend in most companies is to adopt techniques to manage and control their cost components. Using activity based costing (ABCs) is one of the main techniques which the companies should take into consideration. The contractors' knowledge and awareness of the research finding will increase their chances of winning bids within an acceptable profit margin. Applied training courses are recommended for contractors to improve their awareness regarding the importance of overhead costs. Originality/value - This study will extend contractors' awareness and knowledge through guidance on how to gear their financial resources carefully, and how to bid correctly in order to remain competitive in the market place.
引用
收藏
页码:35 / +
页数:14
相关论文
共 50 条
  • [1] Construction projects and the environment in Palestine
    Enshassi, A
    BUILDING RESEARCH AND INFORMATION, 1997, 25 (02): : 111 - 114
  • [2] OPTIMIZATION OF OVERHEAD COSTS OF A CONSTRUCTION CONTRACT
    Scevik, Vojtech
    Vitkova, Eva
    26TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ECONOMIC AND SOCIAL DEVELOPMENT - BUILDING RESILIENT SOCIETY: ECONOMIC AND SOCIAL DEVELOPMENT: BUILDING RESILIENT SOCIETY, 2017, : 515 - 523
  • [3] Trends in productivity improvement in construction projects in Palestine
    Enshassi, Adnan
    Kochendoerfer, Bernd
    Abed, Karem
    REVISTA INGENIERIA DE CONSTRUCCION, 2013, 28 (02): : 173 - 206
  • [4] Causes of Time Waste in Construction Projects in Palestine
    Enshassi, Adnan
    El-Moghany, Said
    Mayer, Peter E.
    Zimmermann, Josef
    ARAB GULF JOURNAL OF SCIENTIFIC RESEARCH, 2010, 28 (01): : 13 - 28
  • [5] Transparency of Costs in Construction Projects
    不详
    BAUINGENIEUR, 2014, 89 : A30 - A30
  • [6] Research costs - Canada to begin funding overhead on projects
    Kondro, W
    SCIENCE, 2000, 290 (5492) : 687 - 687
  • [7] EVALUATION OF THE COMPETITIVENESS OF CONSTRUCTION COMPANY OVERHEAD COSTS
    Siskina, Ala
    Juodis, Arvydas
    Apanaviciene, Rasa
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2009, 15 (02) : 215 - 224
  • [8] Cost diviation in road construction projects: The case of Palestine
    Mahamid, Ibrahim
    Bruland, Amund
    CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (01): : 58 - 71
  • [9] Risk Management in Construction Projects in Palestine: Contractors' Perspective
    Ibrahim, Mahamid
    REVISTA INGENIERIA DE CONSTRUCCION, 2024, 39 (02): : 140 - 150
  • [10] Investigating the Components of Innovation in Construction Projects
    Ozorhon, Beliz
    Oral, Kutluhan
    Demirkesen, Sevilay
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (03)