SIMULATION STUDY OF PREDICTABLE DUE-DATES

被引:138
|
作者
WEEKS, JK
机构
关键词
D O I
10.1287/mnsc.25.4.363
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:363 / 373
页数:11
相关论文
共 50 条
  • [21] On satisfying due-dates in large job shops: Idle time insertion
    Hodgson, Thom J.
    King, Russell E.
    Thoney, Kristin
    Stanislaw, Natalie
    Weintraub, Alexander J.
    Zozom Jr., Andrew
    IIE Transactions (Institute of Industrial Engineers), 2000, 32 (02): : 177 - 180
  • [22] Analysis of optimal solution to the single machine scheduling with fuzzy due-dates
    Feng, Daguang
    Wu, Suwen
    Liu, Bo
    Mao, Lizhen
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 810 - 815
  • [23] Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity
    Atsmony, Matan
    Mor, Baruch
    Mosheiov, Gur
    COMPUTERS & OPERATIONS RESEARCH, 2023, 152
  • [24] On satisfying due-dates in large job shops: idle time insertion
    Hodgson, TJ
    King, RE
    Thoney, K
    Stanislaw, N
    Weintraub, AJ
    Zozom, A
    IIE TRANSACTIONS, 2000, 32 (02) : 177 - 180
  • [25] SEQUENCING WITH DUE-DATES AND EARLY START TIMES TO MINIMIZE MAXIMUM TARDINESS
    BAKER, KR
    SU, ZS
    NAVAL RESEARCH LOGISTICS, 1974, 21 (01) : 171 - 176
  • [26] Satisfying due-dates in large multi-factory supply chains
    Thoney, KA
    Hodgson, TJ
    King, RE
    Taner, MR
    Wilson, AD
    IIE TRANSACTIONS, 2002, 34 (09) : 803 - 811
  • [27] Minimizing total late work on a single machine with generalized due-dates
    Mosheiov, Gur
    Oron, Daniel
    Shabtay, Dvir
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 293 (03) : 837 - 846
  • [28] PROCESSING-PLUS-WAIT DUE-DATES IN SINGLE-MACHINE SCHEDULING
    KAHLBACHER, HG
    CHENG, TCE
    JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1995, 85 (01) : 163 - 186
  • [29] LOCAL SEARCH ALGORITHMS FOR FLOW-SHOP SCHEDULING WITH FUZZY DUE-DATES
    ISHIBUCHI, H
    YAMAMOTO, N
    MISAKI, S
    TANAKA, H
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) : 53 - 66
  • [30] Admission policies for the customized stochastic lot scheduling problem with strict due-dates
    Germs, Remco
    Van Foreest, Nicky D.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (02) : 375 - 383