LEVEL SCHEDULING IN AN AUTOMOBILE ELECTRICAL ANCILLARY INDUSTRY

被引:0
|
作者
ANTO, TV [1 ]
RAJENDRAN, C [1 ]
机构
[1] INDIAN INST TECHNOL,DEPT HUMANITIES & SOCIAL SCI,DIV IND ENGN & MANAGEMENT,MADRAS 600036,TAMIL NADU,INDIA
关键词
LEVEL SCHEDULING; RUNNERS; SEQUENCE-DEPENDENT SETUP TIME; HEURISTIC ALGORITHM;
D O I
10.1016/0166-3615(93)90067-B
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Level scheduling involves the production of products in many batches with reasonably small batch quantities during a scheduling period. The problem under study is quite complex since products have different demand rates and the product setup time is sequence-dependent. First an analysis has been carried out to identify those products for which level scheduling will be carried out. Next the sequence of manufacture of these products is determined by considering the sequence-dependent matrix and using a heuristic algorithm. A simple expression for obtaining the number of maximum possible runs (or batches) of such a sequence is presented.
引用
收藏
页码:201 / 206
页数:6
相关论文
共 22 条
  • [1] Integration of Process Planning and Scheduling with Sequence Dependent Setup Time: A Case Study from Electrical Wires and Power Cable Industry
    Altarazi, Safwan
    Yasin, Omar
    MODELLING, COMPUTATION AND OPTIMIZATION IN INFORMATION SYSTEMS AND MANAGEMENT SCIENCES - MCO 2015 - PT II, 2015, 360 : 283 - 294
  • [2] Level Scheduling for batched JIT supply
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2009, 21 (1-2) : 31 - 50
  • [3] Energy Efficient Level by Level Scheduling for Multiple Workflows in Cloud
    Garg, Ritu
    Shukla, Neha
    INTERNATIONAL JOURNAL OF SOFTWARE INNOVATION, 2019, 7 (03) : 102 - 117
  • [4] Level Scheduling for batched JIT supply
    Nils Boysen
    Malte Fliedner
    Armin Scholl
    Flexible Services and Manufacturing Journal, 2009, 21 : 31 - 50
  • [5] Scheduling under machine breakdown in a continuous process industry
    Liao, CJ
    Chen, WJ
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (03) : 415 - 428
  • [6] Level scheduling under limited resequencing flexibility
    Nils Boysen
    Malte Fliedner
    Armin Scholl
    Flexible Services and Manufacturing Journal, 2010, 22 : 236 - 257
  • [7] Algorithms for the car sequencing and the level scheduling problem
    Andreas Drexl
    Alf Kimms
    Lars Matthießen
    Journal of Scheduling, 2006, 9 : 153 - 176
  • [8] Level scheduling under limited resequencing flexibility
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2010, 22 (3-4) : 236 - 257
  • [9] Algorithms for the car sequencing and the level scheduling problem
    Drexl, A
    Kimms, A
    Matthiessen, L
    JOURNAL OF SCHEDULING, 2006, 9 (02) : 153 - 176
  • [10] A Critical Analysis of Job Shop Scheduling in Context of Industry 4.0
    Liaqait, Raja Awais
    Hamid, Shermeen
    Warsi, Salman Sagheer
    Khalid, Azfar
    SUSTAINABILITY, 2021, 13 (14)