INTEGRATING EXPERT SYSTEMS WITH DYNAMIC-PROGRAMMING IN GENERATION EXPANSION PLANNING

被引:44
作者
DAVID, AK [1 ]
ZHAO, RD [1 ]
机构
[1] TIANJIN UNIV,POWER ENGN,TIANJIN,PEOPLES R CHINA
关键词
D O I
10.1109/59.32604
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:1095 / 1101
页数:7
相关论文
共 7 条
[1]   COMBINED COSTS METHOD FOR OPTIMAL ECONOMIC-PLANNING OF AN ELECTRICAL POWER-SYSTEM [J].
BEGLARI, F ;
LAUGHTON, MA .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, 94 (06) :1935-1942
[2]  
Fox M. S., 1984, Expert Systems, V1, P25, DOI 10.1111/j.1468-0394.1984.tb00424.x
[3]  
JENKINS RT, 1974, ORNL4954 OAK RIDG NA
[4]   METHODOLOGY FOR MODELING A PROJECT-MANAGEMENT CONTROL ENVIRONMENT [J].
MARSHALL, G ;
BARBER, TJ ;
BOARDMAN, JT .
IEE PROCEEDINGS-D CONTROL THEORY AND APPLICATIONS, 1987, 134 (04) :287-300
[5]   PLANNING ELECTRIC-POWER GENERATION - NONLINEAR MIXED INTEGER MODEL EMPLOYING BENDERS DECOMPOSITION [J].
NOONAN, F ;
GIGLIO, RJ .
MANAGEMENT SCIENCE, 1977, 23 (09) :946-956
[6]  
SHANGHRI AP, 1986, IEEE T POWER SYSTEM, V1, P115
[7]  
1982, EL2561 EL POW RES I