共 7 条
- [1] Ashley D, 1999, EVALUATION RISKS BOT
- [2] Harris J., 2001, PROJECT FINANCE INT, P50
- [3] Jamieson B., 1997, DEV TRANSPARENT EFFI
- [4] Kerf M., 1998, 399 WORLD BANK
- [5] Lau M., 2001, PROJECT FINANCE INT, P66
- [6] Ranasinghe M, 1996, CONSTR MANAGE EC, V14, P497
- [7] NPV-at-risk method in infrastructure project investment evaluation [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03): : 227 - 233