共 9 条
- [1] Christian J., Hachey D., Production rates in construction, Pmc., Conf, (1992)
- [2] Handa V.K., Thomas H.R., International study on construction site productivity, CIB W-65 Symp, 2, pp. 999-1002, (1993)
- [3] Harris F., McCaffer R., Modern construction management, pp. 68-73, (1989)
- [4] Oglesby C., Parker H., Howe G., Productivity improvement in construction, (1989)
- [5] Personal Consultant Plus, Reference guide manual, (1987)
- [6] Robbins S., Stuart-Kotze R., Management concepts and practices, (1986)
- [7] Smith G., Shumway J., Thomas H.R., Productivity influcncc factors for baseline comparisons, ClB W-65 Symp, 93, 2, pp. 989-997, (1993)
- [8] Thomas H.R., Sanvido V., Impact of material management on productivity-a case study, J. Constr. Engrg. and Mgmt, 1, 115, pp. 370-384, (1989)
- [9] Tucker R., Roggie D., Hayes W., Hendrickson F., Implementation of foreman dclay surveys, J. Constr. Div, 4, 108, pp. 577-591, (1982)