机构:Pennsylvania Transp. Inst., Pennsylvania State Univ., University Park, PA 16802
THOMAS, HR
SMITH, GR
论文数: 0引用数: 0
h-index: 0
机构:Pennsylvania Transp. Inst., Pennsylvania State Univ., University Park, PA 16802
SMITH, GR
MELLOTT, RE
论文数: 0引用数: 0
h-index: 0
机构:Pennsylvania Transp. Inst., Pennsylvania State Univ., University Park, PA 16802
MELLOTT, RE
机构:
[1] Pennsylvania Transp. Inst., Pennsylvania State Univ., University Park, PA 16802
[2] Dept. of Civ. Engrg., Pennsylvania State Univ., University Park, PA 16802
[3] Dept. of Civ. Engrg., Pennsylvania State Univ., University Park
来源:
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
|
1994年
/
120卷
/
02期
关键词:
D O I:
10.1061/(ASCE)0733-9364(1994)120:2(321)
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
Contract interpretation is a common function of contractors. inspectors, designers, and contract administrators. This paper outlines rules of interpretation that can be used by contract administrators to resolve questions about the interpretation of a contract. The rules, arranged in hierarchical order, arc based on a review of 100 appellate court decisions. The rules are: (1) The plain-meaning rule; (2) patent ambiguity; (3) practical construction; and (4) interpret the contract as a whole. If there is still more than one logical interpretation, one must resort to the order-of-precedence clause or rule against the drafter. The rules are arranged 'in an easy-to-use flowchart format. An example of an actual contract dispute is presented to illustrate how to apply the rules. The outcome is compared to the actual court decision.