FREEZING THE MASTER PRODUCTION SCHEDULE UNDER DEMAND UNCERTAINTY

被引:64
作者
SRIDHARAN, V [1 ]
BERRY, WL [1 ]
机构
[1] UNIV N CAROLINA,GRAD SCH BUSINESS,CHAPEL HILL,NC 27599
关键词
Material Requirements Planning; Planning and Control; Production/Operations Management; Simulation;
D O I
10.1111/j.1540-5915.1990.tb00319.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Managing the trade‐off between achieving a stable master production schedule (MPS) and being responsive to changes in customer requirements is a difficult problem in many firms where providing a high level of customer service is viewed as an important competitive factor. One alternative for managing this trade‐off is to freeze an agreed portion of the MPS. This paper investigates the impact of adjustments in the design parameters of MPS freezing methods on two performance measures (MPS lot‐sizing cost and stability) under stochastic demand conditions in a rolling planning horizon environment given a service level target. Simulation experiments are reported which indicate that many of the conclusions regarding the design of MPS freezing methods obtained under deterministic demand conditions hold under stochastic demand. 1990 Decision Sciences Institute
引用
收藏
页码:97 / 120
页数:24
相关论文
共 21 条
[1]  
Baker KennethR., 1977, DECISION SCI, V8, P19, DOI [DOI 10.1111/J.1540-5915.1977.TB01065.X, 10.1111/j.1540-5915.1977.tb01065.x]
[2]  
BERRYWL, 1979, MASTER PRODUCTION SC
[3]  
Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
[4]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429
[5]   ROLLING HORIZON PRODUCTION PLANNING FOR PROBABILISTIC TIME-VARYING DEMANDS [J].
BOOKBINDER, JH ;
HNG, BT .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) :1439-1458
[6]  
Carlson R. C., 1982, Decision Sciences, V13, P129, DOI 10.1111/j.1540-5915.1982.tb00136.x
[7]   LESS NERVOUS MRP SYSTEMS - DYNAMIC ECONOMIC LOT-SIZING APPROACH [J].
CARLSON, RC ;
JUCKER, JV ;
KROPP, DH .
MANAGEMENT SCIENCE, 1979, 25 (08) :754-761
[8]   REPLANNING FREQUENCIES FOR MASTER PRODUCTION SCHEDULES [J].
CHUNG, CH ;
KRAJEWSKI, LJ .
DECISION SCIENCES, 1986, 17 (02) :263-273
[9]  
De Bodt M. A., 1983, Decision Sciences, V14, P345, DOI 10.1111/j.1540-5915.1983.tb00190.x
[10]  
ETIENNE EC, 1987, J OPERATIONS MANAGEM, V7, P1