CROSS-PARTY COLLABORATION TO REDUCE CONSTRUCTION WASTE TO DESIGN-BUILD PROJECTS

被引:1
|
作者
Nursin, Afrizal [1 ]
Latif, Yusuf [1 ]
Mochtar, Krishna [2 ]
Soeparto, Hari G. [1 ]
机构
[1] Univ Indonesia, Fac Engn, Dept Civil Engn, Kampus UI Depok, Depok 15424, Indonesia
[2] Indonesian Technol Inst, Civil Engn Study Program, Kampus Inst Teknol Indonesia, Tangerang Selatan 15314, Banten, Indonesia
关键词
Collaboration; Conflict; Construction waste; Design-build;
D O I
10.14716/ijtech.v9i4.1819
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waste in the construction industry is a severe problem in various countries in the world, including in Indonesia. Several studies on construction projects over the last three years have found that the Construction Waste (CW) tendency has increased significantly. The objective of this study is to identify existing CW in design-build project and how it can be reduced by increasing collaboration between the stakeholders involved in such projects. The survey method is used to explore and find solutions to the CW problems, and to reduce it by increasing collaboration. Data were obtained from 127 respondents working on a design-build construction project, then processed by using the SEM-PLS 3.0 Professional program to estimate the causal-predictive relationships between stakeholder, culture, communication, conflict, and the collaborative variables that affect the reduction in construction waste on design-build project. A collaborative model between the parties implemented by managing those involved, understanding the culture, minimizing conflict and improving communication, can reduce both physical waste and non-physical construction waste.
引用
收藏
页码:751 / 765
页数:15
相关论文
共 47 条
  • [21] Critical success factors for implementation process of design-build projects in Vietnam
    Chau Ngoc Dang
    Long Le-Hoai
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2016, 14 (01) : 17 - 32
  • [22] Using neural network to predict performance of design-build projects in Singapore
    Ling, FYY
    Liu, M
    BUILDING AND ENVIRONMENT, 2004, 39 (10) : 1263 - 1274
  • [23] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [24] Innovation outcomes and processes in infrastructure projects - a comparative study of Design-Build and Design-Build-Maintenance contracts
    Larsson, Johan
    Eriksson, Per Erik
    Lingegard, Sofia
    Jarvenpaa, Anna-Therese
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2022, 40 (02) : 142 - 156
  • [25] Design and construction coordination problems and planning for design-build project new users
    Chang, Andrew S.
    Shen, Fang-Ying
    Ibbs, William
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (12) : 1525 - 1534
  • [26] Workflow re-engineering of design-build projects using a BIM tool
    Tsai, Meng-Han
    Md, Abdul Matin
    Kang, Shih-Chung
    Hsieh, Shang-Hsien
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2014, 37 (01) : 88 - 102
  • [27] Cross-organization process integration in design-build team
    Cheng, Min-Yuan
    Tsai, Ming-Hsiu
    AUTOMATION IN CONSTRUCTION, 2008, 17 (02) : 151 - 162
  • [28] Examination of communication processes in design-build project delivery in building construction
    Tran, Dai Q.
    Long Duy Nguyen
    Faught, Allen
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 1319 - 1336
  • [29] Critical success factors for implementing design-build: analysing Malaysian public projects
    Lee, Zheng Ping
    Rahman, Rahimi A.
    Doh, Shu Ing
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2022, 20 (05) : 1041 - 1056
  • [30] Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects
    Fathi, Medya
    Shrestha, Pramen P.
    Shakya, Binita
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)