STATISTICAL QUALITY-CONTROL APPLIED TO CODE INSPECTIONS

被引:9
作者
CHRISTENSON, DA
HUANG, ST
LAMPEREZ, AJ
机构
[1] AT&T Bell Laboratories, Naperville
关键词
D O I
10.1109/49.46872
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Code inspections have been used on the 5ESS® Switch project since 1983. Beginning with a training program for all the developers involved in the project, code inspections have improved with each new 5ESS® Switch generic. The improvement in code inspections has been the result of hard work and innovation on the part of the 5ESS® Switch software developers, and the use of some “Statistical Quality Control” (SQC) techniques. Variations on a standard SQC technique, the control chart, have been used to track the metrics indicative of the effectiveness of code inspections. Parameters used in the computation of these metrics include the preparation effort, inspection time, number of inspectors, the size of the inspected unit of code, and the number of errors found at the inspection. The exact form that these “control charts” have taken has evolved and improved with experience. © 1990 IEEE
引用
收藏
页码:196 / 200
页数:5
相关论文
共 6 条
[1]  
ACKERMAN AF, 1984, SOFTWARE VALIDATION
[2]  
BUCK FO, 1981, IBM TR21802 SYS COMM
[3]  
CHRISTENSON DA, 1987, P NAT COMMUN FORUM, V41, P1095
[4]  
CHRISTENSON DA, 1988, P IEEE GLOBAL TELECO, V1, P468
[5]  
Fagan M, 1986, IEEE T SOFTWARE ENG, VSE-12
[6]  
FAGAN ME, 1976, IBM SYST J, V15