DAY THEY BLEW UP SAN ONOFRE - SCENARIO FOR SABOTAGE AT A NUCLEAR POWER PLANT

被引:0
|
作者
SCHLEIME.JD
机构
[1] CA, United States
关键词
D O I
10.1080/00963402.1974.11458151
中图分类号
D81 [国际关系];
学科分类号
030207 ;
摘要
引用
收藏
页码:24 / 27
页数:4
相关论文
共 50 条
  • [31] Control automation in the heat-up mode of a nuclear power plant using reinforcement learning
    Park, JaeKwan
    Kim, TaekKyu
    Seong, SeungHwan
    Koo, SeoRyong
    PROGRESS IN NUCLEAR ENERGY, 2022, 145
  • [32] EFFECT OF HEAT-UP TRANSIENT CONDITION ON THE THERMAL STRATIFICATION IN NUCLEAR POWER PLANT SURGELINE
    Kim, Young-Jong
    Kim, Maan-Won
    Ko, Eunmi
    Lee, Jae-Gon
    Kim, Byoung Chul
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2009, VOL 4, 2010, : 99 - 104
  • [33] Implementation of nuclear power plant simulation in start-up commissioning of reactor control system
    China Nuclear Power Engineering Co. Ltd., Shenzhen, Guangdong, 518124, China
    不详
    Hedongli Gongcheng, 2009, SUPPL. 2 (49-53+59):
  • [34] Changes in the nervous system in chernobyl nuclear power plant accident clean-up workers
    Kholodova N.B.
    Zhavoronkova L.A.
    Neuroscience and Behavioral Physiology, 2011, 41 (1) : 26 - 27
  • [35] EXPERIMENTAL DETERMINATION OF CORE REACTIVITY BUILD-UP WITH IRRADIATION IN LATINE NUCLEAR POWER PLANT
    BERTINI, A
    LAPAROLA, GL
    MONTOIS, P
    PLEINEVAUX, C
    ENERGIA NUCLEARE, 1967, 14 (01): : 10 - +
  • [36] Selection and Experimental Research of the Passive Start-Up Neutron Detector in Nuclear Power Plant
    Jiang, Tianzhi
    Li, Biao
    Zhang, Yun
    Wang, Yinli
    Li, Wenping
    Huang, Youjun
    Shen, Feng
    Sun, Congjian
    Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (03): : 139 - 143
  • [37] Flywheel-based Micro Energy Grid for Reliable Emergency Back-up Power for Nuclear Power Plant
    Abdussami, Muhammad R.
    Gabbar, Hossam A.
    2019 2ND INTERNATIONAL CONFERENCE ON SMART ENERGY SYSTEMS AND TECHNOLOGIES (SEST 2019), 2019,
  • [38] 1990 RESULTS OF GERMAN NUCLEAR-POWER-PLANT OPERATION .1. NUCLEAR GENERATING-UNITS OF UP TO 1000-MW POWER
    不详
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1991, 36 (05): : 238 - 250
  • [39] The Work Day Determination Method of the New "Nuclear Power Plant Construction Budget Quota" Based on the Work Day of "National General Budget Quota"
    Guo Zongzhi
    Chen Xiangting
    PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 965 - 976
  • [40] Heat and fluid flow in accident of fukushima daiichi nuclear power plant, unit 2 (accident scenario based on thermodynamic model)
    Maruyama, Shigenao
    Maruyama, S. (marayama@ifs.tohoku.ac.jp), 1600, Japan Society of Mechanical Engineers (78): : 2127 - 2141