ANALYSIS OF CONTRACTORS PERFORMANCE IN GAZA STRIP CONSTRUCTION PROJECTS

被引:7
作者
Enshassi, Adnan [1 ]
Abdul-Aziz, Abdul-Rashid [2 ]
Abushaban, Saleh [3 ]
机构
[1] IUG, Civil Engn Dept, Gaza, Palestine
[2] Univ Sains Malaysia, Sch Housing Bldg & Planning, George Town, Malaysia
[3] UCAS, Continuing Educ Ctr, Gaza, Palestine
关键词
Performance; contractors; construction and management;
D O I
10.1080/15623599.2012.10773191
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The construction industry has acquired a poor reputation in performance issues. Project success is dependent on, amongst other factors, the performance of the contractors. The aim of this paper is to identify and evaluate the main factors affecting the performance of construction projects in the Gaza strip. Sixty questionnaires were randomly distributed to contractors and 46 questionnaires were received (77% respondent rate). Sixty three factors were identified and categorized into ten groups. The level of importance of these factors were measured and ranked by their importance index from the contractors' perspectives. The most important factors were average delay arising from closures and materials shortage, availability of resources as planned through project duration, leadership skills of the project manager, escalation of material prices, availability of personnel with high experience and qualification and quality of equipments and raw materials in project. It is recommended that construction organizations have a clear mission and vision to formulate, implement and evaluate their performance.
引用
收藏
页码:65 / 79
页数:15
相关论文
共 36 条
[1]  
Abdul-Hadi N.H., 1999, THESIS
[2]  
Birrell G.S., 1988, AACE INT T, pD
[3]  
Brown A., 2000, INT J PROJECT MANAGE, V18, P327, DOI DOI 10.1016/S0263-7863(99)00026-5
[4]   A Benchmarking Service for the evaluation and comparison of scheduling techniques [J].
Cavalieri, Sergio ;
Terzi, Sergio ;
Macchi, Marco .
COMPUTERS IN INDUSTRY, 2007, 58 (07) :656-666
[5]   Developing a benchmark model for project construction time performance in Hong Kong [J].
Chan, APC ;
Chan, DWM .
BUILDING AND ENVIRONMENT, 2004, 39 (03) :339-349
[6]  
Chan D.W., 2002, INT J PROJ MANAG, V20, P23, DOI [10.1016/S0263-7863(00)00032-6, DOI 10.1016/S0263-7863(00)00032-6]
[7]   PPMS: a Web-based construction project performance monitoring system [J].
Cheung, SO ;
Suen, HCH ;
Cheung, KKW .
AUTOMATION IN CONSTRUCTION, 2004, 13 (03) :361-376
[8]   Effect of project characteristics on project performance in construction projects based on structural equation model [J].
Cho, KyuMan ;
Hong, TaeHoon ;
Hyun, ChangTaek .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (07) :10461-10470
[9]  
Chuan Q T., 2006, INT J PROJ MANAG, V21, P24
[10]  
Department of the Environment Transport and the Regions (DETR), 2000, KPI REP MIN CONSTR K