共 50 条
- [3] Enhancing plant start-up reliability-independent critical equipment evaluations PROCEEDINGS OF 2004 ASME POWER, 2004, : 175 - 179
- [7] INTERALUMINA PLANT START-UP AND OPERATIONS E&MJ-ENGINEERING AND MINING JOURNAL, 1983, 184 (05): : 84 - 87
- [9] MATHEMATICAL AND STATISTICAL DESCRIPTION OF THE START-UP RELIABILITY AND START-UP COSTS FOR CONVENTIONAL POWER-STATION EQUIPMENT ENERGIETECHNIK, 1981, 31 (11): : 408 - 412