MINIMIZING THE MAKESPAN WITH LATE START PENALTIES ADDED TO PROCESSING TIMES IN A SINGLE FACILITY SCHEDULING PROBLEM

被引:168
作者
KUNNATHUR, AS [1 ]
GUPTA, SK [1 ]
机构
[1] FLORIDA INT UNIV,COLL BUSINESS ADM,DEPT DECIS SCI & INFORMAT SYST,MIAMI,FL 33199
关键词
algorithms; dynamic programming; Scheduling;
D O I
10.1016/0377-2217(90)90089-T
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the following scheduling problem: Minimize the makespan in a single facility problem where the processing time of a job consists of a fixed and a variable part. The variable part depends on the start time of the job. The objective is to minimize makespan. Two optimizing algorithms based on dynamic programming and branch-and-bound techniques and five heuristic rules have been proposed. The heuristic solutions have been compared with the optimal solution for upto 7 jobs to identify the best heuristic. The detailed computational results for the branch-and-bound and the best heuristic rule are then obtained for problems with up to 15 jobs. © 1990.
引用
收藏
页码:56 / 64
页数:9
相关论文
共 4 条
[1]   SINGLE FACILITY SCHEDULING WITH NONLINEAR PROCESSING TIMES [J].
GUPTA, JND ;
GUPTA, SK .
COMPUTERS & INDUSTRIAL ENGINEERING, 1988, 14 (04) :387-393
[2]  
GUPTA SK, 1987, OMEGA-INT J MANAGE S, V15, P207, DOI 10.1016/0305-0483(87)90071-5
[3]   OPTIMAL REPAYMENT POLICIES FOR MULTIPLE LOANS [J].
GUPTA, SK ;
KUNNATHUR, AS ;
DANDAPANI, K .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1987, 15 (04) :323-330
[4]   A STATE-OF-ART SURVEY OF STATIC SCHEDULING RESEARCH INVOLVING DUE DATES [J].
SEN, T ;
GUPTA, SK .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1984, 12 (01) :63-76