PRODUCTION-ECONOMIC ASPECTS ON SET-UP EFFICIENCY

被引:3
|
作者
EDSTROM, A
OLHAGER, J
机构
[1] Alfakonsult AB, Goteborg, Swed, Alfakonsult AB, Goteborg, Swed
来源
关键词
Compendex;
D O I
10.1016/0167-188X(87)90067-X
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
INDUSTRIAL ECONOMICS - INDUSTRIAL ENGINEERING - Planning - INDUSTRIAL MANAGEMENT - INDUSTRIAL PLANTS - Efficiency
引用
收藏
页码:99 / 106
页数:8
相关论文
共 50 条
  • [41] A NEW SET-UP FOR RADIOCINEMATOGRAPHY
    CHARBON, GA
    GROOT, R
    WEYMAN, G
    ACTA PHYSIOLOGICA ET PHARMACOLOGICA NEERLANDICA, 1962, 11 (3-4): : 504 - &
  • [42] SHORTENING SET-UP TIME
    WAGNER, K
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1987, 77 (08): : 414 - 414
  • [43] Dome set-up in urodynamics
    Chu, Andrew C. M.
    NEUROUROLOGY AND URODYNAMICS, 2007, 26 (04) : 594 - 594
  • [44] New set-up for CNRE
    1600, Elsevier Science B.V., Amsterdam, Netherlands (26):
  • [45] The set-up - Erdman,P
    Vicarel, JA
    LIBRARY JOURNAL, 1997, 122 (02) : 105 - 105
  • [46] Polarized neutron set-up
    Tsulaya, M.I.
    Gabelya, M.S.
    Djamaspishvili, S.I.
    Acta Physica Hungarica, 1994, 75 (1-4)
  • [47] SET-UP FOR A RENOGRAPHY PROGRAM
    STEVENS, WE
    AMERICAN JOURNAL OF ROENTGENOLOGY RADIUM THERAPY AND NUCLEAR MEDICINE, 1962, 88 (02): : 316 - &
  • [48] The 'Set-Up' - Vasilakakos,J
    Hanrahan, M
    OVERLAND, 1997, (147): : 90 - 91
  • [49] SET-UP FOR CYLINDRICAL GRINDING
    不详
    MACHINERY AND PRODUCTION ENGINEERING, 1972, 121 (3127): : 573 - &
  • [50] Photographic 'Kesling set-up'
    Sandler, Jonathan
    Sira, Satnam
    Murray, Alison
    JOURNAL OF ORTHODONTICS, 2005, 32 (02) : 85 - 88