Attitudes towards recycling on construction sites

被引:15
作者
Tam, Vivian W. Y. [1 ,2 ]
Hao, Jane J. L. [3 ]
机构
[1] Univ Western Sydney, Sch Comp Engn & Math, Penrith, NSW, Australia
[2] Univ Western Sydney, Inst Infrastruct Engn, Penrith, NSW, Australia
[3] Ryerson Univ, Dept Architectural Sci, Toronto, ON, Canada
关键词
environment; recycling & reuse of materials; sustainability;
D O I
10.1680/jwarm.15.00006
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Waste management is a major area of concern for construction industries around the world. As the general public becomes more environmentally aware, waste management policies need to be evaluated with a view to making them more effective. With the number of environmental friendly construction projects on the increase, this study examines the attitude towards recycling on construction projects in contextual and applicational issues within Toronto, Canada. A number of theoretical factors causing waste and restricting construction projects from recycling are examined, and the current state of the Toronto construction industry is investigated by conducting a questionnaire survey of key personnel working in the field of construction project management. The aim is to determine what restricts construction sites from recycling and what would create incentives for this to become a more popular practice. The study found that compared with construction industries in other parts of the world, the Toronto construction industry is doing relatively well in terms of recycling and waste management. This paper can provide references for effective implementation of waste management in construction.
引用
收藏
页码:131 / 136
页数:6
相关论文
共 39 条
  • [1] Attitude and behavioral factors in waste management in the construction industry of Malaysia
    Begum, Rawshan Ara
    Siwar, Chamhuri
    Pereira, Joy Jacqueline
    Jaafar, Abdul Hamid
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2009, 53 (06) : 321 - 328
  • [2] Bossink B. A. G., 1996, J CONSTR ENG M ASCE, P56
  • [3] BRUNNER PH, 1993, WASTE MANAGE RES, V11, P27, DOI 10.1177/0734242X9301100104
  • [4] CG (Canadian Government), 2012, CAN ENV ASS ACT
  • [5] Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects
    Cha, Hee Sung
    Kim, Jeehye
    Han, Ju-Yeoun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (07): : 647 - 656
  • [6] Cochran K, 2009, BIOCYCLE, V50, P24
  • [7] Constraints for solid waste management in Somaliland
    Di Bella, Veronica
    Vaccari, Mentore
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WASTE AND RESOURCE MANAGEMENT, 2014, 167 (02) : 62 - 71
  • [8] Evia O.W.W., 2004, CONSTRUCTION MANAGEM, V22, P563, DOI DOI 10.1080/0144619042000226270
  • [9] Guy B, 2001, BIOCYCLE, V42, P75
  • [10] The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme
    Hao, Jane L.
    Hills, Martin J.
    Tam, Vivian W. Y.
    [J]. WASTE MANAGEMENT & RESEARCH, 2008, 26 (06) : 553 - 558