Decomposition of temporal changes in construction labour productivity

被引:7
作者
Ma, Le [1 ]
Liu, Chunlu [1 ]
机构
[1] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
关键词
Australia; construction; error correction model; four-component decomposition; labour productivity; seemingly unrelated regression; temporal change;
D O I
10.1080/15623599.2016.1258755
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Construction productivity is recognized as an indicator reflecting the performance efficiency and competitiveness of the industry. A large amount of research has been carried out focusing on the decomposition of the influential factors and the temporal trends of construction productivity changes, respectively. However, the decomposition of the temporal changes in construction labour productivity has not yet been explored. Analogous to the framework of the productivity frontier, this research argues for a four-component decomposition of the temporal changes in construction labour productivity, including technology, technology-utilization efficiency, the capital-labour ratio and production capacity. An error correction model is subsequently estimated using the panel data regression method to investigate the effects of these components on the temporal changes in construction productivity across a sample of the Australian construction industry. The empirical results con?rm that the effects of the four components on the temporal changes in construction productivity changes vary over the observed time periods. From the aggregate level, the technology-utilization efficiency and capital-labour ratio across the regions are found to be barriers to growth in Australian construction productivity. Nevertheless, the effects of technology-utilization efficiency and production capacity varied significantly over the three sub-periods, when innovative national economic systems were introduced.
引用
收藏
页码:65 / 77
页数:13
相关论文
共 34 条
  • [31] Measuring and modeling labor productivity using historical data
    Song, Lingguang
    AbouRizk, Simaan M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (10) : 786 - 794
  • [32] MODELING CONSTRUCTION LABOR PRODUCTIVITY
    THOMAS, HR
    MALONEY, WF
    HORNER, RMW
    SMITH, GR
    HANDA, VK
    SANDERS, SR
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04): : 705 - 726
  • [33] FACTOR MODEL OF CONSTRUCTION PRODUCTIVITY
    THOMAS, HR
    YIAKOUMIS, I
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1987, 113 (04): : 623 - 639