An Approach to Locate an In Pit Crusher in Open Pit Mines

被引:23
|
作者
Rahmanpour, M. [1 ]
Osanloo, M. [1 ]
Adibee, N. [1 ]
AkbarpourShirazi, M. [2 ]
机构
[1] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn & Management Sci, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2014年 / 27卷 / 09期
关键词
Open Pit Mining; In Pit Crushing and Conveying; Hub Location Problem;
D O I
10.5829/idosi.ije.2014.27.09c.18
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Haulage costs accounts for 45 to 60% of the total operating costs in large open pit mines. Cost efficiency and high reliability of semi mobile or combined "In Pit Crushing-Conveying (IPCC) and truck" systems compared to conventional truck-shovel systems alone, makes it more appealing to be utilized in modern mining activities. Semi mobile systems have the advantages of both systems, and its operating costs depend on the location of the in pit crushing unit. In this paper, the effective factors on determination of a suitable location of an IPCC are studied and it is investigated as a single hub location problem. The main concerns of the optimum location are minimizing haulage costs and choosing a location regarding the environmental concerns. The method is applied in Sarcheshmeh Copper Mine (SCM), and according to the results, locations C1 to C4 are candidate locations, and applying the hub model, location C2 on level 2450 is suggested to locate the IPCC.
引用
收藏
页码:1475 / 1484
页数:10
相关论文
共 50 条
  • [41] Open Pit Mining with Blasting: GeoEcological Aftermath
    Adushkin, V. V.
    Solov'ev, S. P.
    Spivak, A. A.
    Khazins, V. M.
    JOURNAL OF MINING SCIENCE, 2020, 56 (02) : 309 - 321
  • [42] Enhancing the performance of integer models for addressing the long-term production planning problem in open pit mines by decision variable fixation based on parametric analysis of the final pit limit
    Hasozdemir, Kursat.
    Erçelebi, Selamet Gürbüz.
    Mining Science and Technology (Russian Federation), 2024, 9 (02): : 74 - 84
  • [43] Concurrent open-pit mine production and in-pit crushing-conveying system planning
    Paricheh, Morteza
    Osanloo, Morteza
    ENGINEERING OPTIMIZATION, 2020, 52 (10) : 1780 - 1795
  • [44] Applying the Rock Engineering Systems Approach to the Stability of Bench Berms in Open Pit Mining
    Santander, Cristian
    Vallejos, Javier A.
    Velasquez, Jorge
    Castillon, Mario
    MINING METALLURGY & EXPLORATION, 2024, : 3339 - 3356
  • [45] Reserve estimation of an open pit mine under price uncertainty by real option approach
    AKBARI Afshin Dehkharghani
    OSANLOO Morteza
    SHIRAZI Mohsen Akbarpour
    International Journal of Mining Science and Technology, 2009, 19 (06) : 709 - 717
  • [46] A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty
    Gilani, Seyyed-Omid
    Sattarvand, Javad
    Hajihassani, Mohsen
    Abdullah, Shahrum Shah
    RESOURCES POLICY, 2020, 68
  • [47] A simulated annealing based approach for open pit mine production scheduling with stockpiling option
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    Ahmad, Waqas
    Salman, Saad
    RESOURCES POLICY, 2021, 71
  • [48] Optimizing blast design and bench geometry for stability and productivity in open pit limestone mines using experimental and numerical approaches
    Deressa, Geleta Warkisa
    Choudhary, Bhanwar Singh
    Jilo, Nagessa Zerihun
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [49] Reserve estimation of an open pit mine under price uncertainty by real option approach
    AKBARI, Afshin Dehkharghani
    OSANLOO, Morteza
    SHIRAZI, Mohsen Akbarpour
    Mining Science and Technology, 2009, 19 (06): : 709 - 717
  • [50] Development of Dust Emission Prediction Model for Open-Pit Mines Based on SHPB Experiment and Image Recognition Method
    Du, Shanzhou
    Chen, Hao
    Ding, Xiaohua
    Liao, Zhouquan
    Lu, Xiang
    ATMOSPHERE, 2024, 15 (09)