共 50 条
- [21] Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness Computational and Applied Mathematics, 2018, 37 : 6774 - 6794
- [22] Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection Optimization Letters, 2024, 18 : 751 - 766
- [26] Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness Journal of Scheduling, 2015, 18 : 147 - 153
- [29] Minimizing maximum absolute lateness and range of lateness under generalizeddue dates on a single machine Annals of Operations Research, 1999, 86 : 507 - 526