共 50 条
- [31] START-UP AND FIRST PERIOD OF USE OF WASTE-GAS SYSTEM OF 300 T OXYGEN CONVERTERS STEEL IN THE USSR, 1972, 2 (05): : 355 - &
- [32] INDUSTRIAL EXPERIENCES OF STEAG-AG WITH WASTE-GAS DESULFURIZATION PLANTS AFTER 700 MW BITUMINOUS COAL BLOCKAGE STAUB REINHALTUNG DER LUFT, 1986, 46 (10): : A47 - A51
- [33] Transient Numerical Simulation of Regenerative Systems with Waste Gas Recirculation Strategies in Glass Production Plant APPLIED SCIENCES-BASEL, 2019, 9 (07):
- [34] The first experience in operation of industrial plant for heap leaching of gold Gorn Zh, 9-10 (101-102):
- [35] POLLUTANTS IN SINTERING WASTE-GAS AND PHYSICAL-PROPERTIES OF POLLUTANTS WITH RESPECT TO WORKING-CONDITIONS AND OPERATIONS IN SINTERING PLANT STAHL UND EISEN, 1977, 97 (06): : 291 - 291
- [37] AMSTERDAM WASTE FIRED POWER PLANT©: FIRST YEAR OPERATING EXPERIENCE NAWTEC17: PROCEEDINGS OF THE 17TH ANNUAL NORTH AMERICAN WASTE TO ENERGY CONFERENCE, 2009, : 269 - 277
- [39] Experience with NARX model identification of an industrial power plant gas turbine PROCEEDINGS OF THE 41ST IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 2002, : 3710 - 3711
- [40] ELECTRICAL DESIGN AND OPERATING EXPERIENCE WITH PINNACLES WASTE HEAT GAS TURBINE PLANT IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (06): : 1271 - &