International Space Station United States Operational Segment Crew Quarters On-orbit vs. Design Performance Comparison

被引:3
作者
Broyan, James Lee, Jr. [1 ]
Borrego, Melissa Ann [2 ]
Bahr, Juergen F. [3 ]
机构
[1] NASA, Johnson Space Ctr, Houston, TX USA
[2] MEI Technol Inc, Houston, TX USA
[3] ERC Inc, Huntsville, AL USA
来源
SAE INTERNATIONAL JOURNAL OF AEROSPACE | 2011年 / 4卷 / 01期
关键词
D O I
10.4271/2009-01-2367
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
The International Space Station (ISS) United States Operational Segment (USOS) received the first two permanent ISS Crew Quarters (CQ) on Utility Logistics Flight Two (ULF2) in November 2008. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The CQs provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, communication equipment, redundant electrical systems, and redundant caution and warning systems. The racksized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. The deployment and initial operational checkout during integration of the ISS CQ to the Node is described. Additionally, the comparison of on-orbit to original design performance is outlined for the following key operational parameters: interior acoustic performance, air flow rate, temperature rise, and crewmember feedback on provisioning and restraint layout
引用
收藏
页码:98 / 107
页数:10
相关论文
共 3 条
[1]  
[Anonymous], 2007, 50357 SSP
[2]  
[Anonymous], 2007, 50781 SSP
[3]   International Space Station USOS Crew Quarters Development [J].
Broyan, James Lee, Jr. ;
Borrego, Melissa Ann ;
Bahr, Juergen F. .
SAE INTERNATIONAL JOURNAL OF AEROSPACE, 2009, 1 (01) :92-106