2-MACHINE SCHEDULING UNDER ARBITRARY PRECEDENCE CONSTRAINTS

被引:9
作者
KURISU, T [1 ]
机构
[1] OSAKA UNIV,FAC ENGN,DEPT APPL PHYS,SUITA,OSAKA 565,JAPAN
关键词
D O I
10.15807/jorsj.20.113
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:113 / 131
页数:19
相关论文
共 50 条
[41]   SCHEDULING ALGORITHMS FOR A 2-MACHINE FLEXIBLE MANUFACTURING SYSTEM [J].
ANDREATTA, G ;
DESERTI, L ;
GIRALDO, LN .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1995, 7 (03) :207-227
[42]   THE 2-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH TOTAL TARDINESS [J].
SEN, T ;
DILEEPAN, P ;
GUPTA, JND .
COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (04) :333-340
[43]   AUTOMATED 2-MACHINE FLOWSHOP SCHEDULING - A SOLVABLE CASE [J].
KISE, H ;
SHIOYAMA, T ;
IBARAKI, T .
IIE TRANSACTIONS, 1991, 23 (01) :10-16
[44]   SCHEDULING A 2-MACHINE ROBOTIC CELL - A SOLVABLE CASE [J].
LEVNER, E ;
KOGAN, K ;
LEVIN, I .
ANNALS OF OPERATIONS RESEARCH, 1995, 57 :217-232
[45]   SINGLE MACHINE SEQUENCING UNDER PRECEDENCE CONSTRAINTS. [J].
Kurisu, Tadashi .
Technology Reports of the Osaka University, 1977, 27 (1337-1363) :27-34
[46]   Decentralized scheduling with precedence constraints [J].
Hongtan Sun ;
Thomas C. Sharkey .
Optimization Letters, 2021, 15 :2555-2575
[47]   SCHEDULING TASKS WITH AND/OR PRECEDENCE CONSTRAINTS [J].
GILLIES, DW ;
LIU, JWS .
SIAM JOURNAL ON COMPUTING, 1995, 24 (04) :797-810
[48]   Decentralized scheduling with precedence constraints [J].
Sun, Hongtan ;
Sharkey, Thomas C. .
OPTIMIZATION LETTERS, 2021, 15 (08) :2555-2575
[49]   On the approximability of average completion time scheduling under precedence constraints [J].
Woeginger, GJ .
AUTOMATA LANGUAGES AND PROGRAMMING, PROCEEDING, 2001, 2076 :887-897
[50]   2-MACHINE SHOP SCHEDULING PROBLEMS WITH BATCH PROCESSING [J].
KLEINAU, U .
MATHEMATICAL AND COMPUTER MODELLING, 1993, 17 (06) :55-66