A stochastic model of cash flow forecasting considering delays in owners' payments

被引:17
作者
Andalib, Reza [1 ]
Hoseini, Abdollah [1 ]
Gatmiri, Behrouz [1 ]
机构
[1] Univ Tehran, Sch Civil Engn, Coll Engn, Construct Engn & Management Program, Tehran, Iran
关键词
Delay; interim payments; construction finance; intertemporal correlation; uncertainty;
D O I
10.1080/01446193.2018.1433309
中图分类号
F [经济];
学科分类号
02 ;
摘要
Delays in progress payments have always been one of the most aggravating difficulties, threatening the desired profit margin and should be considered based on the owners' financial records at the bidding stage. However, previous models have often ignored the probabilistic nature of cash inflow. The conducted research endeavours to develop a new stochastic simulation-based framework for forecasting the cash flow of the construction projects considering the owners' payment history in previous projects and intertemporal correlation between successive progress payments. This process involves introducing the Budget Realization Index, with probabilistic nature, whose underlying distribution is determined based on the owners' behaviour. The model was applied to four real projects in Iran. The financing costs inflicted on the contractors stood in the range of the simulation results in the uncertainty level of 50-80%. Therefore, the proposed systematic framework would appropriately perform for forecasting contractors' financial status through the project.
引用
收藏
页码:545 / 564
页数:20
相关论文
共 41 条
[21]   Cash flow projections for selected TxDoT highway projects [J].
Jarrah, Ra'ed ;
Kulkarni, Devdatta ;
O'Connor, James T. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (03) :235-241
[22]  
Kaka A. P., 1996, CONSTR MANAG EC, V14, P35, DOI DOI 10.1080/01446199600000005
[23]  
KENLEY R, 2003, FINANCING CONSTRUCTI, DOI DOI 10.4324/9780203467398
[24]  
Lucko G., 2010, CONSTR RES C 2010 IN
[25]   Project cash flow analysis in the presence of uncertainty in activity duration and cost [J].
Maravas, Alexander ;
Pantouvakis, John-Paris .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (03) :374-384
[26]   Sources of contractor's payment risks and cash flow problems in the New Zealand construction industry: project team's perceptions of the risks and mitigation measures [J].
Mbachu, Jasper .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (10) :1027-1041
[27]   A comprehensive model for planning and controlling contractor cash-flow [J].
Mihaly, Goeroeg .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) :481-492
[28]  
Navon R., 1995, CONSTR MANAG ECON, V13, P501
[29]  
Oberlender G., 2000, PROJECT MANAGEMENT E
[30]   Artificial neural network cost flow risk assessment model [J].
Odeyinka, Henry A. ;
Lowe, John ;
Kaka, Ammar P. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2013, 31 (05) :423-439