A stochastic model of cash flow forecasting considering delays in owners' payments

被引:17
作者
Andalib, Reza [1 ]
Hoseini, Abdollah [1 ]
Gatmiri, Behrouz [1 ]
机构
[1] Univ Tehran, Sch Civil Engn, Coll Engn, Construct Engn & Management Program, Tehran, Iran
关键词
Delay; interim payments; construction finance; intertemporal correlation; uncertainty;
D O I
10.1080/01446193.2018.1433309
中图分类号
F [经济];
学科分类号
02 ;
摘要
Delays in progress payments have always been one of the most aggravating difficulties, threatening the desired profit margin and should be considered based on the owners' financial records at the bidding stage. However, previous models have often ignored the probabilistic nature of cash inflow. The conducted research endeavours to develop a new stochastic simulation-based framework for forecasting the cash flow of the construction projects considering the owners' payment history in previous projects and intertemporal correlation between successive progress payments. This process involves introducing the Budget Realization Index, with probabilistic nature, whose underlying distribution is determined based on the owners' behaviour. The model was applied to four real projects in Iran. The financing costs inflicted on the contractors stood in the range of the simulation results in the uncertainty level of 50-80%. Therefore, the proposed systematic framework would appropriately perform for forecasting contractors' financial status through the project.
引用
收藏
页码:545 / 564
页数:20
相关论文
共 41 条
[1]   Late Payment and Nonpayment Encountered by Contracting Firms in a Fast-Developing Economy [J].
Abdul-Rahman, Hamzah ;
Kho, Meiye ;
Wang, Chen .
JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2014, 140 (02)
[2]   Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area [J].
Al-Joburi, Khalil I. ;
Al-Aomar, Raid ;
Bahri, Mohammed E. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (04) :382-390
[3]   Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities [J].
Ali, Mohammed Mubashir ;
Elazouni, Ashraf .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (09) :839-856
[4]   Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting [J].
Batselier, Jordy ;
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (01) :28-43
[5]  
BOUSSABAINE A, 1999, CONSTRUCTION MANAGEM, V17, P745, DOI DOI 10.1080/014461999371088
[6]   A contractor's analysis of the likelihood of payment of claims [J].
Carmichael, David ;
Balatbat, Maria .
JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2010, 15 (02) :102-+
[7]   Assessing the accuracy of cash flow models: The significance of payment conditions [J].
Chen, HL ;
O'Brien, WJ ;
Herbsman, ZJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (06) :669-676
[8]  
CHEN HL, 2005, INT J PROJECT MANAGE, V0023, P00463
[9]   Estimating a project's profitability: A longitudinal approach [J].
Chen, Hong Long ;
Chen, Chun-I ;
Liu, Che-Hung ;
Wei, Nai-Chieh .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) :400-410
[10]   An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns [J].
Chen, Hong Long .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (05) :604-614