THE CRANE SCHEDULING PROBLEM

被引:268
作者
DAGANZO, CF
机构
关键词
D O I
10.1016/0191-2615(89)90001-5
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:159 / 175
页数:17
相关论文
共 31 条
[1]  
Baker K. R., 1974, INTRO SEQUENCING SCH
[2]  
Barnes J. W., 1977, AIIE Transactions, V9, P25, DOI 10.1080/05695557708975117
[3]   LOW TRAFFIC APPROXIMATION FOR QUEUES [J].
BLOOMFIELD, P ;
COX, DR .
JOURNAL OF APPLIED PROBABILITY, 1972, 9 (04) :832-840
[4]  
DAGANZO CF, 1986, UNPUB PRODUCTIVITY M
[5]  
Edmond E, 1975, DOCK HARBOUR AUTH, V56, P230
[6]  
Elmaghraby S, 1974, AIIE T, V6, P1, DOI DOI 10.1080/05695557408974926
[7]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR
[8]   OPTIMAL SOLUTION OF SCHEDULING PROBLEMS USING LAGRANGE MULTIPLIERS .1. [J].
FISHER, ML .
OPERATIONS RESEARCH, 1973, 21 (05) :1114-1127
[9]  
FISHER ML, 1973, P S THEORY SCHEDULIN
[10]  
FRANKEL E, 1974, PORT DESIGN ANAL MET